one Product use edit
Dalian Changhong Sealing and Insulation Waterproofing and seepage prevention of various industrial and civil buildings and structures, waterproofing of various underground works and waterproofing of non leaking parts. ※ Construction process: 1. Basic requirements for the base course of roof construction: A: The base course needs to be paved with 1:2.5 cement mortar to form a 20-30mm thick leveling layer, which should be flat and polished, firm, flat, free of sand, and free of concave, loose, bulge, pockmarks, etc. The flatness shall be checked with a 2m long ruler, and the gap between the leveling layer and the ruler shall not exceed 5mm B: The surface of the leveling layer must be dry, and the cement mortar should have sufficient strength, and its moisture content should not exceed 9%. C: The connection between the leveling layer and the protruding roof structure (parapet, chimney, etc.) and the corner of the wall shall be made into an arc with a radius of 20mm, and a slightly lower pit shall be made around the drain for drainage. D: The gradient and flashing of the leveling layer shall meet the design and relevant requirements. 2. Process flow: clean the additional layer of base course, treat the surface of coiled material, apply glue on the base course, bond the surface of coiled material, exhaust the air, compact the end of coiled material, and seal the edge as the protective layer 3 Operation process: A: base course cleaning: the base course that passes the acceptance before construction shall be cleaned again. B: Additional layer: additional layers must be made for special parts such as internal and external corners, pipe roots, and water inlets. Polyurethane coating or one layer of coiled material can be used. C: Glue coating on the surface of base course and coiled material: spread the coiled material on the clean base course, dip (401 or 404) adhesive with a long handle roller brush, evenly coat the coiled material, and then apply it on the base course. When painting, do not repeatedly brush at the same place to avoid the formation of gel. Special parts such as pipe root and water outlet shall be painted with board brush. D: After the coiled material and the base course are coated with glue, they can be paved only when the adhesive is basically dry and they are not bonded by hand. 4. Sticking of roofing coiled material: A: Start from the downhill of the flow slope, pop up the standard line, and the coiled material configuration should be vertical to the flow slope. B: Every time a roll of coiled material is paved, a soft long handle roller brush shall be used to roll the coiled material laterally from one end of the coiled material to completely eliminate the air penetration between the coiled material and the base layer. If bubbles cannot be eliminated, do not cut the coiled material, and exhaust by yourself to avoid affecting the overall waterproof effect. C: Coiled material joint bonding two Standard use edit
matters needing attention
Do not lay self-adhesive coiled materials on the frozen base surface;
It is not allowed to construct on the polluted base course with high moisture content;
The packaging and separation paper of self-adhesive coiled materials can only be removed before and during paving;
When the sealant is not used up, the container shall be tightened and sealed in time;
Storage and transportation
Materials shall be stored in a dry and ventilated environment to prevent exposure to the sun and rain. Coils of different types and specifications shall be stacked separately.
The stacking height shall not exceed 5 layers, and the vertical stacking height shall not exceed 2 layers.
Under normal conditions, the storage date is one year (from the date of production).
project | Indicator value | |
JL1 | | |
Breaking tensile strength (Mpa) | Normal temperature ≥ | seven point five |
60℃ ≥ | two point three | |
Elongation at break (%) | Normal temperature ≥ | four hundred and fifty |
-20℃ ≥ | two hundred | |
Tear strength (KN/m) | ≥ | twenty-five |
Water impermeability, 30min | 0.3Mpa | no-leakage |
Low temperature bending (℃) | ≤ | -40 |
Heating expansion amount (mm) | Extension< | two |
Shrinkage< | four | |
Hot air aging (80℃*168h) | Breaking tensile strength retention rate (%) ≥ | eighty |
Retention rate of elongation at break ≥ | seventy | |
High standard elongation appearance | No crack | |
Alkali resistance [10% ca (OH) 2 room temperature * 168h] | Breaking tensile strength retention rate (%) ≥ | eighty |
Retention rate of elongation at break ≥ | eighty | |
Ozone aging (40℃)*168h | elongation 40%.500pphm | No crack |