Color steel plate installation method diagram Color steel plate partition installation construction scheme In recent years, color steel plates have been widely used in the construction of large-scale factories, office buildings, municipal venues and other facilities. Generally, color steel roof is divided into single-layer color steel roof and composite sandwich insulation color steel roof. What is the installation method of color steel plate? Today, I would like to introduce the installation method diagram of color steel plate. 1、 How to install color steel plate mobile room? 1. The movable plank house is similar to the building, and the surrounding and partition wall foundation should be leveled, preferably reinforced concrete, which is relatively solid; Then erect columns, connect the skeleton with transverse beams, and connect the upper partition, exterior wall panels and door and window frames; Then lay the floor, install the upper layer, and then install the roof truss and roof panel; Finally, install doors and windows and pull vertical supports. 2. The mobile house is an environmentally friendly and economical mobile house with light steel as the skeleton, sandwich panel as the enclosure material, standard modulus series as the space combination, bolt connection as the components, and a new concept. It can be easily and quickly assembled and disassembled, realizing the universal standardization of temporary buildings, and establishing the building concept of environmental protection, energy saving, fast and efficient, The temporary housing has entered the field of series development, integrated production, supporting supply, inventory and reusable stereotyped products. 2、 Construction scheme for installation of color steel plate partition wall 1. Get familiar with the drawings and carefully review the plane layout of color steel plate, node requirements, the relationship between color steel plate and buildings, the color, filler and basic size requirements of color steel plate itself, the size and layout of doors and windows in color steel plate partition, the type of auxiliary materials and other unknown contents. 2. Secondary plate arrangement drawing is an important step for color steel plate prefabrication and installation, It is to convert the design drawings into intermediate conversion drawings that can be processed for the second time in the factory, make standard specification plates into different types of wall plates, combine them to reflect the design intent, and produce standard plates in the color steel plate factory, and assemble them at the construction site, which can not only ensure the firmness of the wall plates but also speed up the installation of color steel plates. 3. According to experience, door openings Gaps and installation allowance shall be fully considered between window openings and seams. Scratches, heavy pressure and surface impact shall be prevented during the whole transportation, manufacturing and installation process to prevent uncorrectable pits and scratches. The plastic protective film on both sides of the color steel plate can only be removed after the installation is completed and thoroughly cleaned. 4. The setting out work before the color steel plate installation shall be carried out after the completion of the ground (floor), And it can only be carried out when other relevant conditions for installation are met, such as large equipment has been transported in place, concealed ground pipelines have been adjusted, and the main installation work of technical interlayer has been basically completed. Setting out is to draw the horizontal projection of color steel plate (50mm wide) and the positions of doors and windows on the ground. The error of the center line of the upper and lower mangers on the same vertical plane should be within 1.0%, that is, 3mm. 5 The upper and lower troughs are generally made of aluminum alloy profiles with internal and external R angles. They are fixed on the line drawn on the ground with shooting nails. The location of the shooting nails should be 1.2-1.5m in a straight line, and the corners and terminals should be 0.2m away from the edge. If water stop rubber strips are used, put two rubber strips (Ф 2-3) under the troughs before shooting nails, and form a waterproof isolation seal after fixing the shooting nails. The upper troughs are made of pressed aluminum, For hard suspended ceiling, nail gun is used to fix it on the top plate; for soft suspended ceiling, suspender is used to hang it under the surface, and the height is subject to the ceiling net height, The vertical joint is even. During operation, carefully clean the protective film on the vertical joint and temporarily remove it, but never remove it. Clean the sundries in the groove and the adhesive liquid solidified hard blocks. Otherwise, it is difficult to adjust the vertical joint evenly and compactly with no amount of force, The short side shall be fixed by T-shaped aluminum and connecting plate blind rivets. The hanging flat roof shall be flat as far as possible, and the plate joints shall be dense, even, smooth, free of marks and damages. The operation shall be the same as that of the vertical wall plate. 8. Color steel plate shall be used to wrap the columns, boxes, and internal and external R angles. The columns in the purification area shall be wrapped with б=50 color steel plate to save materials and unify the internal and external R angles. 50. First, stainless steel door and window frames shall be installed at the door and window openings and fixed firmly, Pay attention to the opening direction when installing the door, install the window glass, and adjust the opening speed and force of the door closer. Generally, the opening speed is fast in the first half, and the torque is small and slow in the second half when closing the door, so as to reduce the impact and noise of closing the door. 9. Sealed silica gel is in the purification area, and the following gaps that may affect the cleanliness should be coated with sealing silica gel: the splicing joints between color steel plates, all gaps between the R corner and the wall plate, roof; The gap between the air conditioning duct, air outlet, high-efficiency filter and the wall and roof; The electricity passes through the gap between the protective pipe slot of the top plate of the wall panel and the edge of the opening; The gap between all switch socket lamps and the top plate of color steel plate; Clearance between all processes, water supply and drainage, protective pipes and openings; The gap between glass and frame; Sealed silica gel shall be installed in the color plate with good sanitary conditions. After thorough cleaning and dedusting, it shall be carried out uniformly. Otherwise, the silica gel seam is easy to be polluted and blackened. Within 24 hours after the silica gel is laid, there shall be no large amount of dust operations and washing the ground with water, which may affect the solidification and fastness of the sealed silica gel. 3、 Relevant concept 1. Installation, words and verbs, generally refer to fixing equipment and machinery in a certain position, sometimes also refer to computer installation, that is, installing a system or software in a computer. 2. The substructure of the foundation building transferring load to the foundation is the foundation, which is generally composed of soil and rock. Relevant recommendations Advantages of color steel plate and color steel plate in thermal insulation performance Three precautions in the use of color steel plate and color steel plate activity rooms Can color steel rooms accommodate people for a long time? [Shanghai Qizhu Color Steel Plate Activity Room Co., Ltd.] Color steel activity room installation method Color steel plate activity room