home page  >  Product supply  >  Fine chemical industry  >  paint  >  Anticorrosive paint >Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer
  •  Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer

Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer

Price

Electric discussion

  • Minimum order quantity: 100 kg
  • Location: Changsha, Hunan
  • Price: electricity
  • Total supply: 5000 kg
  • Delivery period: 3 days
  • Release time: 2024-06-20 00:01:53

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Color:

    other

  • Brand:

    Anwei

  • Glossiness:

    Flat surface

  • Water resistance:

    excellent

  • Acid resistance:

    No blistering and rust

  • Constructability:

    Spraying, brushing and roller coating

  • Maximum drying time:

    2 hours

  • Minimum total solids content:

    fifty-three

  • Painting area per kg (twice):

    7 ㎡

  • Net weight of single piece:

    20 kg

  • quality guarantee period:

    12 months

  • Purpose:

    Anti corrosion and rust prevention

  • Package specification:

    twenty

Material anti-corrosion Primer

Main components: This product is based on advanced material resin, special resin, pigment auxiliary The paint composed with solvent is B component, and the imported aliphatic isocyanate is the other component, which is two-component self drying coating
Main characteristics: Good weather resistance; Strong leveling; Good decorative performance of paint film (plump, bright, high hardness); Good chemical resistance; Good light, color and cleaning performance, no discoloration and cracking for 15 years; High adhesion, good mechanical properties.
Main purpose: Used for all kinds of traffic vehicles, construction machinery, advanced instruments and equipment cement Walls, ceramic tiles aluminium alloy Walls and other objects with high decoration requirements are especially suitable for outdoor use.
Technical indicators:
Appearance of paint film: the paint film is flat and smooth, and the color conforms to the standard template
Fineness: ≤ 20 μ m, no requirement for metallic finish and matt
Drying time: standard thickness single coating, 25 ℃, surface drying ≤ 1h, solid drying ≤ 48h
Gloss: (40 °),
Matte: agreed (20 °~ 80 °)
Pencil hardness: ≥ 2H
Adhesion: ≤ 1 (cross cut method, grade)
Cupping test: ≥ 4mm
Bending test: ≤ 2mm
Water resistance: 240h, no blistering, no wrinkling, no gloss loss
Vapor oil resistance: 24h, no blistering, no wrinkling, no gloss loss
Weather resistance: artificial accelerated aging: 1000h; Light loss ≤ 1, pulverization ≤ 1, cracking ≤ 1
Package specification: 20 kg/hall.
Basic parameters:
Ratio: paint: curing agent=10:1 (weight ratio)
Construction time limit: 8h, (25 ℃)
Theoretical dosage: 200~250g/m2
Recommended coating number: Coating twice (wet by wet), dry film thickness 55 ± 5 μ m
Matching paint: Material finish.
Surface treatment: The base surface of painting shall be firm and clean, free of all dirt such as oil stain and dust, and the base surface of painting shall be free of acid, alkali or moisture condensation. For the primer of materials that have been cured for a long time, after roughening with sandpaper, the next finishing coat can be applied. The cement wall shall be sealed with H01-1 epoxy sealing primer, and then the primer and finishing coat of construction materials can be applied; A matt varnish is recommended for metallic paint.
Painting method: Airless spraying:
Diluent: XFC diluent
Dilution rate: 0~15% (calculated by paint weight)
Nozzle diameter: about 0.4~0.5mm
Ejection pressure: 15~20Mpa
Air spraying:
Diluent: XFC diluent
Dilution rate: 20~50% (calculated by paint weight)
Nozzle diameter: about 1.8~2.5mm
Ejection pressure: 0.3~0.5Mpa
Roller coating/brush coating:
Diluent: XFC diluent
Dilution rate: 0~20% (calculated by paint weight)

security whole Measures Construction B D class See Safety and Health Operation Signs for detailed explanation.
through wind amount 1 kg paint or thinner
Paint a. reaching 10% of lower limit of explosion limit (LEL) 58 m three
b. Meet the safety and health standard (TLV) 2800 m three
Diluent a. up to 10% of LEL 170 m three
b. Up to TLV 8000 m three
Storage hide stage limit ***Sealed container 12 months
notes meaning matter term Before use, add component B into component A, or mix according to the required ratio. Mix as much as you want, and use it after mixing evenly, and use it up within 6 hours after preparation.
Tools used during construction must be kept dry and clean.
The coated surface must be cleaned and free of moisture, acid and alkali.
During paint preparation and coating, it is strictly prohibited to contact with water, acid, alkali, alcohol, etc. Component B is easy to react with water, alcohol and other substances, so the remaining packaging barrels of component B after paint preparation must be tightly covered to avoid damage caused by moisture and cementation.
In order to fully cross link and fully cure the two components, the paint can be cured at 25 ℃ for 0.5 hour after being prepared; If the temperature is lower than 25 ℃, the curing time can be appropriately extended.
This paint is not limited by * * * long coating interval, and it can be applied with low second finish paint without sandpaper roughening after complete curing.
During construction and drying and curing, the relative humidity shall not be greater than 80%, or serious blistering of the paint film will be caused.
When the temperature is lower than 0 ℃, the curing reaction stops and outdoor construction is not suitable.
The product can be delivered for use only after 7 days of curing after coating.
prepare notes In order to use our products correctly, please read the User Guide carefully.

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Supply Classification

    Hunan Anwei Paint Co., Ltd

    Building Materials General

    nine year

    Certified
    • Enterprise type:

    • Business model:

      Production and processing

    • Honors and qualifications:

      0 items

    • Main business:

      Porcelain coating, water-based ceramic wall film, epoxy resin paint, fluorocarbon paint, polyurethane paint, acrylate paint, chlorinated rubber paint, special anti-corrosion paint

    • Address:

      Hunan Environmental Protection Technology Industrial Park, No. 199, Zhenhua Road, Yuhua District, Changsha City, Hunan Province

    I want to join

    Online inquiry
    • Hunan Anwei Paint Co., Ltd

    • Material Paint Material Anticorrosive Primer Material Metal Anticorrosive Primer