Product introduction:
BGL insulation and sound insulation board, also known as building floor insulation and sound insulation board or floating floor insulation and sound insulation board, is a floor insulation and sound insulation product as its name implies. The real estate market in China generally provides consumers with commercial houses designed according to the initial decoration standard, and the sound insulation function is not perfect. Therefore, in real life, many consumers will be troubled by noise. The source of this noise is the impact of the floor. There are various reasons for the impact of the floor, such as the children playing upstairs, the elderly knocking on the floor while walking on crutches, dragging furniture Although it is a common behavior in life, it may cause inconvenience to others due to insufficient sound insulation of the floor.
This product is polymerized with molded graphite benzene Board (full name: B1 graphite molded polystyrene ethylene Foam board, referred to as: SEPS )It is a base plate, which is an integrated board product with thermal insulation and sound insulation function made by a specific process in the factory, referred to as thermal insulation and sound insulation board for short. See Figure 1 for its structural diagram.
Features:
① Bottom right angle groove: air sound insulation, sound insulation and vibration reduction | ② L-shaped staggered joint: crack resistance and good integrity |
③ Top protective film: to enhance the protection of the slab, increase the tensile strength, and enhance the tightness of the slab and concrete |
Performance index:
Product live shot:
Construction process:
1. The construction method of graphite polystyrene board insulation system is simple, with high system integrity and durability. The connection with the reinforced concrete floor does not need any bonding layer, nor does it require wet work. It can be directly paved on the flat reinforced concrete floor. The basic structure of the thermal insulation and sound insulation system shall meet the requirements of the following figure.
2. Construction process and on-site shooting.