home page  >  Product supply  >  Special building materials  >  Site construction materials  >  Other site construction materials >Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District
  •  Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District

Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District

Price

MOQ

1200.00 yuan/kg

1000 kg

  • Minimum order quantity: 1000 kg
  • Location: Beijing
  • Price: electricity
  • Total supply: 9999999 kg
  • Delivery period: 1 day
  • Release time: 2024-09-22 08:14:21

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Place of Origin:

    Shunyi

  • Brand:

    Haiyan Xingye

  • Company:

    ton

  • texture of material:

    other

Changping District asphalt Quotation of road cold patching/cold asphalt construction

Features of asphalt road cold patch/quotation of road cold patch/

Mainly engaged in Beijing, Hebei, Tianjin, Inner Mongolia, Hohhot and other regions

1、 Product Introduction

Road Maintenance Department door Hot mixed asphalt mixture is usually used to repair the pavement. However, due to the influence of weather, temperature, pit size, quantity, damage degree and other factors, hot material repair can not be timely repaired for the pit that appears at any time, especially in winter, which will inevitably lead to increased damage, not only waste repair materials, but also affect traffic safety and reduce road service life.

The cold patching material uses special methods to modify the asphalt, so that the asphalt has the cohesiveness, pressure sensitivity and viscoelasticity, and can stick to the repair site for a long time without falling off after proper compaction. Cold patching material has been widely used in various provinces and cities for its advantages of being able to repair pavement under all day conditions, simple operation, good repair quality, long storage, cost saving, etc., and is increasingly recognized and welcomed by road maintenance departments.

2、 Characteristics of cold replenishment

1. All day repair materials
Cold patching material is applicable to a wide range of ambient temperatures, ranging from - 30 ℃ to 50 ℃. It can be used in rainy, snowy or sunny days

2. Simple construction
When cold patching materials are used to repair pavement pits and grooves, no adhesive layer oil is required. The materials can be taken at any time, and heavy construction machinery is not required. Impact compaction, manual compaction or vehicle tire rolling can be used according to different repair conditions of the pavement. In addition, the areas repaired with cold patching materials do not need to be closed to traffic, and can be opened to traffic immediately, greatly alleviating the traffic pressure caused by road repair construction.

3. Good repair quality
The cold patching material has strong aging relieving and bonding properties. The repaired pits are not easy to fall off, crack and other undesirable phenomena, and do not need to be repaired repeatedly.

4. Low repair cost
When cold patching materials are used for construction, they are not limited by the weather, the size and number of pits, and there is no need for heating or mixing during patching. They can be used at any time according to the actual amount. The remaining materials can be used in the next patching, without causing material waste. They can be used 100% truly.

3、 Scope of use of cold replenishment

1. This product is suitable for repairing and maintaining damaged pits and ruts on the pavement of expressways and airport runways.

2. It is applicable to the pavement restoration of general roads, * * streets, damaged pits, excavated holes, and underground pipelines Manhole cover Repair and maintenance of small shallow pits around and in front of the warehouse door.

3. Applicable to bridge expansion joint Heavy load road bridge junction, road curve with large traffic volume and special pavement repair.

4、 Construction method of cold replenishment

clear:

In general repair, the gravel and waste residue in and around the pit to be repaired shall be cleaned up, and there shall be no mud, ice and other sundries in the pit. For the repair of expressway and * * road excavation works, the repaired caves and trenches should have neat cutting edges, and the waste residue should be removed until the solid solid surface is seen.

fill:

Fill enough cold patching materials into the pit, knowing filler About 1.5 cm above the ground, the input of materials for expressway and general road repair can be increased by 20% or 10%. After filling, the middle point of the pit shall be higher than the surrounding road surface in an arc shape.

If the pavement potholes are damaged at a height of more than 5cm, the filling work shall be done every 3-5 cm, and the filling and compaction shall be done layer by layer.

Compaction:

After the paving is even, select appropriate compaction tools and methods for compaction according to the field repair environment, repair area size and high-rise degree. Such as: manual backhoe, manual tamper, vibrating plate tamper, flat bottom aluminum platen, truck tire, roller or paver and other compaction methods.

check before acceptance:

The surface of the repaired pit shall be smooth, flat, and free of wheel marks. The surrounding and corners of the pit shall be well compacted without looseness. Generally, the compaction degree shall be more than 93%.

matters needing attention

1. During low-temperature construction, it shall be stored in the warehouse above 5 ℃ for 24 hours.

2. When repairing high-grade highways, the surrounding and corners of the repair area shall be fully compacted.

3. It will be more economical and effective to take the method of repairing at any time instead of the traditional centralized repair method.

5、 Parameters of new road cold patching

1. Specific gravity of compacted cubic meter: 1 cubic meter ≈ 2.36 tons


2. Approximately repairable area of 1 ton of material:

High level of repair -------- approximate repairable area

3cm-------------17m2

5cm-------------10m2

8cm-------------6.25m2

10cm------------5m2

  •  Tax registration certificate

    Tax registration certificate

  •  The people's Republic of China organization code certificate

    The people's Republic of China organization code certificate

  •  Business license

    Business license

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Beijing Haiyan Xingye Concrete Admixture Sales Co., Ltd

    Building Materials General

    fifteen year

    Certified
    • Enterprise type:

      Building materials enterprises

    • Business model:

      Production and processing

    • Honors and qualifications:

      3 items

    • Main business:

      Concrete preservative/cold asphalt cold filler/pervious concrete/concrete impermeable agent/non sparking cement mortar/cold asphalt

    • Address:

      Linhe Development Zone, Shunyi District, Beijing

    I want to join

    Online inquiry
    • Beijing Haiyan Xingye Concrete Admixture Sales Co., Ltd

    • Quotation for cold patching/cold asphalt construction of asphalt roads in Changping District