home page  >  News Center >Industry trends

Industry trends

  • Waterproof and leak stoppage method of elevator shaft in Harbin

    Harbin Elevator Well Waterproof and Leakage Repairing Method Company has always adhered to the corporate purpose of "seeking market by reputation, survival by quality, development by technology, and efficiency by management", and provided good services to customers. The construction steps of the leak stopping waterproof material for the elevator shaft are as follows: 1. The base course shall be treated to remove the honeycomb, pitted surface and loose concrete; Remove the oil stain, soil and water on the inner wall of the elevator to make its surface clean and pure; 2. Use quick setting waterproof plugging slurry for reinforcement and troweling; 3. Brush the backwater material 2-3 times, with an interval of 12 hours. The cause of elevator shaft leakage: the cause of serious leakage around the internal corner of the elevator shaft

    2023/12/08 12:53:42
  • Construction Method for Leakage Stopping of Expansion Joints in Sewage Treatment Pool

    Construction method of expansion joint plugging of sewage treatment pool General buildings will build a large pool on the top of the building to facilitate secondary water supply or emergency water supply. If this kind of pool is not well prepared during construction, it is easy to have leakage problems in later use. Where are these areas that are easy to penetrate? How can we stop the leakage of the pool? Now let's have a look with the editor. Construction method 1 of water pool leakage stoppage: leakage at construction joints and construction cold joints 1. Leakage cause: leakage at construction joints and construction cold joints is a construction defect, which is probably caused by improper construction during concrete pouring, and this process will be poured twice

    2023/11/13 09:39:04
  • What are the maintenance methods of expansion joints in hydropower stations

    What are the maintenance methods for the expansion joint leakage of the hydropower station? Jiangsu Lanlong Building Waterproof and Leak Stopping Engineering Co., Ltd. Expansion joint leakage and leak stoppage methods for basement joint joint leakage treatment Grouting machine, electric drill, patch board, wrench, pliers, screwdriver, water stop needle, high-pressure pipe, hammer, chisel, ladder, etc. are common tools in the basement waterproof and leak stoppage construction. 2. Prepare polyurethane grouting fluid, plugging agent, diluent, engine oil and other materials, which are commonly used in waterproofing and plugging. 2、 Drilling and grouting 1. The soft base is poor in strengthening the leaking part of the base. We call it the soft base, and the conventional treatment scheme of the soft base is to clean the soft base with a chisel

    2023/11/07 09:40:13
  • Construction treatment scheme of expansion joint leakage plugging

    The construction solution of water leakage and plugging of expansion joints High pressure grouting waterproof and plugging method can effectively solve the leakage, water stop, waterproof and plugging of concrete structure joints, construction joints, deformation joints, honeycombs, pits and concrete shrinkage cracks in underground works. Jiangsu Lanlong Building Waterproof and Leak Stopping Engineering Co., Ltd. has simple and effective waterproof and leak stopping construction technology, small equipment volume, and is not limited by the size of waterproof and leak repairing construction site. The waterproof construction grouting materials and caulking materials currently used in the waterproof plugging method have reached the advanced level in China, and some have reached the international level. In the waterproof and leak stoppage method, special professional

    2022/07/02 10:23:42
  • Maintenance and plugging of expansion joint of basement car ramp in Linyi, Shandong

    Shandong Linyi Expansion Joint Waterstop Seepage Zone Water Plugging Treatment Method Jiangsu Lanlong Building Waterproof Plugging Co., Ltd. 1. Introduction to Grouting Materials This product is a transparent liquid with light color to amber color. It is a two-component high pressure plugging material made of macromolecule nano polymer and a variety of additives. It is a fast and efficient high content material that can both plug and consolidate. It can be used for water plugging, seepage prevention and reinforcement in various projects. 2. Material characteristics This material is made of two kinds of materials. According to the different proportion, the solidification time of the slurry is different, and it is elastic. This method eliminates the traditional polyurethane grouting process and has a long warranty period

    2022/04/27 09:25:13
  • How to deal with water seepage from expansion joint of sewage tank in Tongxiang Sewage Treatment Plant

    The technology of Jiangsu Lanlong Building Waterproof and Leak Stopping Engineering Co., Ltd.: leak stoppage is done after there is water, and waterproof is done before there is water, so in order, waterproof is before water leakage, leak stoppage is after water leakage, and leak stoppage is a remedial measure, belonging to the maintenance category. There is no rated standard for plugging, but there is a rated standard for waterproofing. The warranty for plugging can be agreed, but the waterproof warranty is five years. The methods of plugging can be varied, and feasible schemes can be formulated according to the actual situation, but all methods are inseparable: plugging up and draining down, plugging and draining together. For all kinds of leakage, follow the combination of hardness and softness, and use softness to overcome hardness

    2022/03/25 19:38:06
1/1 6 messages in total   home page previous page one next page Last

News classification

Jiangsu Lanlong Building Waterproof and Leak Stopping Engineering Co., Ltd

Building Materials General

three year

Certified
  • Enterprise type:

    Construction enterprises

  • Business model:

    Others

  • Honors and qualifications:

    0 items

  • Main business:

    Leakage stoppage of expansion joint of sewage pool, settlement joint of basement, coal gallery, elevator shaft, cable trench and sewage pipeline

  • Address:

    Tinghu District, Yancheng, Jiangsu

I want to join

 Personal WeChat