home page  >  News Center >Event promotion

Event promotion

  • Construction treatment scheme for plugging and leaking at the connecting port of Panjin underground garage

    Construction Treatment Plan for Leakage Stopping and Water Leakage Repairing at the Connecting Port of Panjin Underground Garage The specific steps for leakage stoppage of underground garage are as follows: 1. The leakage of underground garage must be found out by chiseling to find the leakage point and leakage line, and targeted leakage stoppage shall be carried out; 2. The principle of combining rigid and flexible, expanding and strengthening, and external rigid and internal flexible shall be adopted for the plugging of leakage points and leakage lines, that is, the flexible grouting plugging materials that can be grouted, expanded, and penetrated in water must be selected internally, and the rigid height plugging agent shall be used for external plugging; 3. The settlement joint plugging must be carried out in the joint. The combination of rigid and flexible, expansion strengthening and four lines of plugging defense are very effective, that is, from the inside to the outside, they are soft, rigid

    2023/12/11 12:55:34
  • Practice and introduction of joint joint plugging and maintenance plugging with water for cement pipes

    Cement pipe joint joint plugging, maintenance and plugging with water and introduction of Jiangsu Lanlong Building Waterproof and Plugging Engineering Co., Ltd. Cement pipe joint plugging, maintenance and plugging with water, construction scheme: the project department will discuss the repair of the above seepage points and finally determine the repair plan. 1. The inspection condition and degree of water seepage of the pool shall be marked on the drawing, and the repair account shall be prepared. The person who tracks and signs shall be responsible. 2. During the repair: special personnel shall be assigned to track and repair. The repair operators must be conscientious and responsible. During the repair, different repair methods shall be adopted according to the leakage and seepage of water. 1...

    2023/11/15 12:19:52
1/1, 2 messages in total   home page previous page one next page Last

News classification

Yancheng Kailan Building Waterproof Engineering Co., Ltd

Building Materials General

six year

Certified
  • Enterprise type:

    Construction enterprises

  • Business model:

    Others

  • Honors and qualifications:

    0 items

  • Main business:

    Leakage stoppage of expansion joint of sewage pool, settlement joint of basement, coal gallery, elevator shaft, cable trench and sewage pipeline

  • Address:

    Tinghu District, Yancheng, Jiangsu

I want to join

 Personal WeChat