Pool expansion joint, construction joint, leakage high-pressure grouting plugging

2022/11/30 10:39:04 Source: Yancheng Kailan Building Waterproof Engineering Co., Ltd Views: thirty-four

Pool expansion joint, construction joint, leakage high-pressure grouting plugging

Leakage stoppage of sewage pool, expansion joint of sewage pool, leakage stoppage of water pool, settlement joint of sewage pool, broken crack of sewage pool, deformation joint of sewage pool, construction joint of sewage pool, leakage stoppage under pressure, leakage stoppage with water

Leakage stoppage of sewage pool

1、 Project status:

In case of serious water leakage at the bottom plate and wall of the sewage pool, our technicians have investigated the site and developed a set of practical construction scheme based on years of practical experience.

2、 Cause of water seepage

The leakage of the sewage pool is mainly caused by the leakage of the wall and the sewage pool, or by the settlement of the bottom plate of the sewage pool or cracks caused by large bearing pressure.

3: Main application materials for construction: water-soluble polymer combination nano grouting materials are selected.

1. Introduction to grouting materials

The product is a light to amber transparent liquid. It is a two-component high pressure plugging material composed of high molecular nano polymer and a variety of additives. It is a kind of high composition plugging material that can both plug and consolidate quickly. It can be used for water plugging, seepage prevention and reinforcement in various projects.

2. Material characteristics

This material is made of two kinds of materials. According to different proportions, the setting time of slurry is different and it is elastic. This method eliminates the traditional polyurethane grouting process and has a long warranty period.

(1) This material has good hydrophilicity, and it penetrates and diffuses upstream along the incoming water channel, consolidates with surrounding concrete, sand, soil, etc., and rapidly hardens to form an impermeable consolidation layer, which has been widely used to block water inrush under high pressure and prevent water flowing and water seepage in the foundation.

(2) This material has a large cohesive force with concrete and soil particles, and can produce highly elastic consolidation body, so it can fully adapt to the deformation of foundation or other base courses, making it difficult to find the initial strength of reinforcement due to cracks and collapses.

(3) In the structure with water, the slurry will not be washed away. In the reaction process, the effective consolidation area is rapidly enlarged due to the diffusion of gas, and a much larger consolidation body can be obtained than other types of slurry.

(4) According to the different needs of the project, the viscosity of the grouting fluid can be adjusted. For concrete projects, such as basement, circulating water pool and other small cracks, the grout can quickly penetrate after grouting, forming a firm bond and strong impermeability.

(5) The curing speed of slurry can be adjusted according to the construction needs.

(6) Single grouting equipment is used during construction, which is easy to clean, simple and feasible, and low in comprehensive cost.

(7) Immersion of the consolidated body in water is harmless, harmless and pure to human body.

(8) The corrosion of the water stop steel plate is blocked by high-pressure grouting, and all of it penetrates into the concrete cracks, so no further treatment is required.

3. Material technical guidance

Project technical indicators

Appearance: light yellow~amber transparent liquid, harmless and tasteless

Density: g/m3 1.0~1.10

Viscosity, 20 ℃, Mpa. s 100~400

Gel time: tens of seconds~tens of minutes

Bonding strength Mpa ≥ 1.0

Expansion rate,% ≥ 300

Water volume 20 times

4、 Construction preparation

1. The project manager responsibility system is implemented in this project.

2. Construction management system.

5、 Construction process and key points

1. Construction process of leakage plugging at the sewage pool location: determine the leakage location of the sewage pool foundation pit → clean the leakage base surface → chisel the "V" groove quick plugging agent to embed the grouting pipe, draw the rod to form a cavity → install the grouting nozzle → inject macromolecule nano slurry under high pressure → observe → repair leakage → remove the grouting nozzle → slot hole repair → apply glue → paste → check → acceptance

   2. Key points of construction

(1) Clean the leaking part of sewage pool and chisel "V" groove

(2) The grouting pipe shall be embedded with quick plugging agent, and the spacing shall be determined according to the actual situation, generally about 1m.

(3) Use the high-pressure grouting pump to inject the water-soluble macromolecule nano leak stopping agent into the expansion joint and concrete void joint from the grouting pipe until it cannot be pressed (injection rate ≤ 0.011/min), then close the valve, and cut (remove) the grouting nozzle after the grout has solidified.

(4) Clean equipment and tools with solvent after grouting.

3. High pressure grouting method

Introduction to high-pressure grouting leak stoppage method: high-pressure grouting leak stoppage method is to use mechanical high-pressure power (high-pressure grouting machine) to inject water-soluble polymer nano grouting materials into concrete cracks. When grout encounters water in concrete cracks, it will quickly disperse, emulsify, expand, and consolidate, so that the consolidated elastomer fills all cracks in concrete, The water flow is completely blocked outside the concrete structure to achieve the purpose of water stop and leak stoppage.

Grouting is applicable to underground garage settlement joints, caverns, pump houses, pools, dam tunnels, rock foundations, cable trenches and other projects for water plugging, leakage repair and seepage prevention. It is made of a variety of high molecular materials B Two fluids are injected into the leakage part with specific high pressure apparatus in equal amount to make it fill the leakage cracks, and no leakage will occur in more than 10 years. Our company also provides special polymer material construction technology consulting services.

High pressure grouting plugging technology is a new waterproof technology of high-pressure airless grouting with international advanced level, which is a new technology used in water-soluble grouting materials in developed countries.

(1) This construction method is to use the huge pressure generated by the high-pressure grouting machine to send the materials to the middle part of the gap of the wall body, so that the middle part of the materials is the center and diffuses around. After the materials and water react and harden quickly, the gaps are filled to achieve the effect of strengthening the foundation, plugging and seepage prevention.

(2) The high-pressure grouting machine used in this method has high grouting pressure and large flow, which can quickly stop water and is indeed an effective water blocking method.

(3) The pouring point of this method starts from the center of the structure, especially for the concrete wall with a thickness of more than 10cm, this method is faster and more effective.

6、 Precautions

1. Construction precautions

(1) During grouting, the grouting pipe tip shall be buried reasonably, and the pressure shall be closely watched to prevent explosion.

(2) Operators shall wear glasses, masks, gloves and other labor protection appliances.

2. Precautions for the storage of polymer grouting materials:

(1) Polymer grouting materials shall be sealed and stored in a cold and dark warehouse, and shall be kept by a specially assigned person. The keeper shall be familiar with the properties of the materials.

(2) Containers containing materials shall be clearly labeled and stored by category.

7、 Quality assurance measures

1. The quality of materials shall be strictly controlled. The polymer grouting materials used shall be provided with product certificates and instructions. The construction can only be carried out after passing the on-site sampling and retest. Fake and inferior products shall not be used.

2. Strictly follow the operating procedures and technical specifications, and do not cut corners during construction.

3. Adhere to the inspection and acceptance system, and adhere to self inspection, mutual inspection and special inspection.

8、 Civilized construction management

(1) Team management

1. The construction personnel are not allowed to enter the non construction area when they are in the construction area.

2. All construction personnel shall wear uniform and march in and out of the construction site.

3. The construction personnel shall receive pre job training and comply with the relevant provisions of Party A.

(2) Construction site management

1. Products shall be stored separately.

2. Materials shall be stacked neatly.

3. Do a good job in site management, and clean up and transport the waste in time.

After many years of exploration and experience, as well as learning and training in the Yangtze River Academy of Sciences and the Polymer Grouting Branch of the China Water Resources Society, the company has successfully mastered the special process of polymer grouting waterproof and leak stopping construction with water! This process was recommended by the Yangtze River Academy of Sciences. It was the key recommended material at the grouting seminars held by the Yangtze River Academy of Sciences in 2002 and 2009. It is an environmental protection plugging material and construction process at home and abroad. Our company has introduced this material and has achieved good results after more than ten years of practice. Our company has advanced engineering technicians, production and construction management personnel, construction teams and professional construction equipment. It has undertaken a large number of construction projects, underground projects, water conservancy projects, environmental protection projects, municipal, subway, tunnels, pools, culvert works, waterproofing, seepage prevention and plugging construction, especially for massive concrete crack leakage, basement, tunnel, mine water leakage and pool seepage prevention and leakage, has many years of successful experience in handling water leakage, construction performance all over the country, and construction technology is in the domestic * * * position.

We have scientific theoretical basis, rich practical experience, more strict management procedures, and good construction reputation. Cooperating with our company, we can completely solve the problem of underground engineering leakage without secondary leakage.

Disclaimer: Hangzhou Shangyi Information Technology Co., Ltd. does not declare or guarantee the correctness or reliability of all information published on CNBM Online; You hereby accept and acknowledge that you shall bear the risk arising from reliance on any information. Hangzhou Shangyi Information Technology Co., Ltd. has the right but not the obligation to improve or correct errors or omissions in any part of the information published.

News classification

Yancheng Kailan Building Waterproof Engineering Co., Ltd

Building Materials General

six year

Certified
  • Enterprise type:

    Construction enterprises

  • Business model:

    Others

  • Honors and qualifications:

    0 items

  • Main business:

    Leakage stoppage of expansion joint of sewage pool, settlement joint of basement, coal gallery, elevator shaft, cable trench and sewage pipeline

  • Address:

    Tinghu District, Yancheng, Jiangsu

I want to join

 Personal WeChat