Xichang Integrated Fire Water Tank Installation Technology

Source: Building materials network enterprises Release date: 2024/5/15 16:13:49

Xichang Integrated Fire Water Tank Installation Technology

one No leakage - the gap between formwork EPDM three yuan EPDM sealing material

two The price is competitive - comparable to the cost of reinforced concrete pool, even saving 30%

three Large size - can be assembled according to user needs 1-20000m3 , even infinite water tank (pool);

four Good sanitation effect - because the inside of the pool body is food grade SUS304-2B Stainless steel material;

five High strength - the product structure design is designed by the steel structure engineer of the design institute, with both top pressure and lateral pressure.

The overflow alarm water level is the overflow water level of the pool and water tank. The water level signal is not sent to the controller in the fire control room, but should be sent to B AS System alarm. The water level for stopping water make-up is the water pool and water tank open pump Upper limit of water supplement. When the water level reaches this level, the water pump will stop automatically.

This signal does not need to be sent to the controller in the fire control room. The water level for starting water make-up is the lower limit of the water pool and water tank for starting pump water make-up. When the water level is reached, the pump will start automatically.

This signal does not need to be sent to the controller in the fire control room. The fire alarm water level reflects that the water level of the pool or water tank has begun to be lower than the necessary storage water level, indicating that the water pump or electric The valve cannot be opened automatically or there is water leakage in the pool and water tank.

The signal shall be sent to the controller alarm display in the fire control room. stop Fire pump The water level reflects that the fire pool is about to be dry and it will directly control the stop of the fire hydrant pump or spray pump work.

The signal shall be sent to the controller alarm display in the fire control room.

one The integrated set of water pump is delivered to the site, and the motor has been installed with the base. It is unnecessary to remove the water pump and motor when finding the flat base.

two Place the base on the foundation, pad wedge-shaped sizing blocks near the foundation screws, and raise the base by about 20-40 Mm, ready for filling with water snail slurry after leveling.

three Use a level gauge to check the levelness of the base. After leveling, tighten the anchor nuts and fill the base with cement slurry.

four through 3-4 After the cement is dry and solidified, check the water levelness again.

five Clean the dirt on the supporting plane of the base, the plane of the water pump foot and the plane of the motor foot; Put the water pump and motor on the base.

six Adjust the level of the pump shaft, tighten the nuts properly after leveling to prevent moving, install the motor after the adjustment is completed, and pad iron plates at the places that are not level , There is a certain clearance between the pump and the coupling.

seven Place a flat ruler on the coupling and check whether the pump axis line coincides with the motor axis line. If there is no heavy platform, place a sheet under the foot of the motor or pump , Make the outer circle of the two couplings level with the ruler. Then take out several thin iron sheets of the pad. Replace the iron sheet with a whole iron plate that has been planed. And recheck the installation.

Xichang Integrated Fire Water Tank Installation Technology

one . There is no weld in the bolt connection - hot galvanized bolts are used for screwing between the template and the template, the steel structure skeleton and all accessories, thus avoiding the disadvantage that the anti-corrosion treatment after welding is difficult and easy to rust; There is no transverse seam.

two Long service life - all stressed parts are made of materials 2.5mm-3.5mm Hot dip galvanizing and 0.4mm-0.5mmSUS304-2B Stainless steel material, all of which are assembled without welding, and sealing materials are made of EPDM EPDM.

The surface of the pool is protected by epoxy coal tar pitch. Double layer anti-corrosion (asphalt layer) is applied inside and outside the tank External hot dip galvanized coating Internal hot dip galvanized coating Stainless steel layer) , If the zinc coating is damaged during transportation or installation, epoxy zinc rich shall be used Epoxy glass flakes are heavily anti-corrosive. Therefore, the service life is long seventy More than years;

three Short installation period - splice molding block, pool installation fifteen It can be completed and used in about days;

four Integral installation - the gap between formwork EPDM EPDM sealing material;

five Low cost - comparable to the cost of reinforced concrete pool, even saving 30%

six . The specification and size can be changed at will - it can be assembled according to the user's needs 1-20000m3 , or even an infinite water tank (pool).

seven . Meet the water quality requirements - because the inside of the tank is food grade SUS304-2B Stainless steel material;

eight The fire pump station has high strength - the product structure design is designed by the steel structure engineer of the design institute, and the top pressure and lateral pressure are all based on 100kN/ M2 and calculated as anhydrous; The top pressure and lateral pressure are transmitted to the box body and then to the steel structure skeleton in the box body.

nine Energy conservation and environmental protection - the product can be reused and recycled, fully meeting the current national environmental protection standards;

ten After retail service - the quality of the raw materials produced by our company is checked and accepted in strict accordance with the national standards, and the installation is strictly in accordance with the enterprise standards, so there is no need for after-sales service.

eleven Convenient communication between users and suppliers: holes can be opened according to the construction unit's site, and the connecting pipes are connected without welding.


I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
/ Number of records: 98   home page previous page next page Last