Inorganic pure porcelain coating
Product Introduction
Pure porcelain coating is a brand new, integrated protection and beautification cement Concrete and steel structure surface treatment Protected products. Pure porcelain coating adopts new polymer brightening ingredients, which has strong protection ability to objects, strong resistance to natural aging (sunlight, rain, cold and hot changes), and is easy to maintain. The surface coating treated with this product is compact, corrosion resistant, wear-resistant, weather resistant and self-cleaning.
Main characteristics
1. Strong corrosion resistance (acid resistance, alkali resistance, salt resistance, solvent resistance), high bonding strength.
2. Low light loss rate, good color retention and no yellowing due to prolonged exposure.
3. Waterproof and oil stain proof, can be directly washed or scrubbed to keep it fresh
4. Good wear resistance and high hardness.
Main purpose
It is widely used for decoration and protection of bridges, tunnels, culverts, internal and external walls of buildings and steel structures.
Packaging specification
20 kg/barrel (paint) curing agent 4kg/hall
Technical indicators
Color and appearance of paint film
|
The paint film is flat and smooth, with high hardness and abrasion resistance
|
Viscosity (Coat 4# cup ,25℃),S
|
≥50
|
Fineness, μ m
|
≤40
|
Solid%
|
≥60
|
Flexibility, mm
|
one
|
Adhesion (circle drawing method, grade)
|
≤1
|
Drying time (standard thickness single coating), 25 ℃
|
Surface dry ≤ 1hr
Dry ≤ 24hr
|
Hardness (swing rod)
|
≥1
|
Water resistance (25 ℃) 96hr
|
No blistering and falling off
|
Salt water resistance (3% NaCl, 25 ℃, 360hr)
|
No blistering, no rust, no falling off
|
Matching paint
Primer: water-based epoxy sealing primer (one coat).
Intermediate paint: water-based epoxy resin intermediate paint (one coat).
Finish paint: inorganic pure porcelain paint (twice)
surface treatment
1. The base course shall be solid, dry, flat, clean, free of floating ash and oil stains.
2. The corresponding primer must be applied, and the primer must be applied evenly, and the base layer must be sealed.
3. Before painting the primer, check the water content and PH value of the base material putty. The water content is less than 10%, and the PH value is less than 10.
Drying time:
Surface drying of coating: about 4H/25 ℃, recoating interval ≥ 12H/25 ℃ (drying time will vary with ambient temperature and humidity)
Climatic conditions: Ambient and base temperature>5 ℃, humidity<85%.
Painting reference
Paint density 1.35-1.48g/cm ³
The theoretical amount is 125-135g/㎡ as the finish paint (film thickness 35 μ m, excluding loss)
Proportioning paint: curing agent=5:1 (wt)
Applicable period (25 ℃) 6hr
Painting interval 4hr
Coating parameters
Air spraying
Diluent water
Dilution rate 20-30% (by weight of paint) to prevent dry spraying
Nozzle diameter is about 2.0-2.5mm
Air pressure 0.3-0.4Mpa (about 3-4kg/cm ²)
Airless spraying
Diluent water
Dilution rate 5-15% (calculated by paint weight) (pay attention to prevent dry spraying)
Nozzle diameter is about 0.4-0.5mm
Ejection pressure 12-15MPa (about 1.2-1.5kg/㎡)
Brushing
Diluent water
Dilution rate 10-20% (by weight of paint)
Storage and transportation
It shall be stored in a cool, dry and ventilated place, away from fire source, waterproof, leak proof and high temperature proof. The storage period of paint shall be one year, and the curing agent shall be one year.
matters needing attention
1. Please read the instructions before construction.
2. Avoid contact with pi fu and eyes.
3. If the paint comes into contact with pi fu, it should be cleaned with warm water or appropriate detergent. If the paint comes into contact with eyes, wash with plenty of water and seek medical advice immediately.
4. Ensure good ventilation.
5. Observe all health and safety regulations on site.