Huanqi UPVC pipe Dao General Agent Guangdong Huanqi PVC tube Primary Agent Manager pin Huanqi:
(1) Huanqi UPVC Installation of pipes. ① The adhesive must be shaken well before use; ② Pipes and sockets must be cleaned, The smaller the socket clearance, the better ; use Emery cloth Or the saw blade handle is combined and roughened, and a thin layer of glue is evenly brushed inside the bell mouth, and the outer part of the ring mouth Brush the glue twice until it is dry Insert people in place after 40-60s, and pay attention to increase or decrease the drying time according to the climate change; ④ When bonding Do not touch water. After the pipe is in place, it must be laid flat in the trench. After the joint is dry The backfilling shall be started within 24h, and sand shall be used around the pipeline Fill tightly, and reserve the joint parts for mass backfilling. The soil around the elbow branch joint must be strengthened and compacted ;) Huanqi UPVC When the pipe is sleeved with the steel pipe, the steel pipe connection must be cleaned and coated with glue Huanqi UPVC Tube heating becomes soft (but not scorched) and then socket on the steel Pipe and cooling treatment, if possible, it is better to add pipe hoop ;⑥ Looper type joints shall be used. The elbows and divergent T-joints shall be consolidated with concrete to prevent excessive movement after pressure is applied.
(2) Huanqi UPVC Use of pipes. Huanqi UPVC There are three main connection forms of pipes, namely rubber interface (R-R), bonding (T-S) and flange connection. In case of water leakage after construction, pipe replacement, sleeve bonding, glass fiber method, welding and rapid repair can be used Repair by joint and other methods. ① The whole pipe section needs to be replaced if the pipe is damaged in a large area, and rubber interface, socket connection and closing can be used Flange connection for pipe replacement ;② The solvent method can be used to deal with the leakage at the solvent bonding point. At this time, the water in the main pipe shall be drained to form negative pressure in the pipe, and then the adhesive shall be injected into the pores of the leakage part. Due to the negative pressure in the pipe, the adhesive It will absorb into the pores to stop leakage ;③ The sleeve bonding method is mainly aimed at the leakage of pipe through holes and joints. Drain first The water in the pipe is long 15-20cm pipes of the same diameter shall be cut longitudinally, and the inner surface of the casing shall be bonded Roughen with the surface of the pipe to be patched, and cover it tightly at the leaking place after gluing ;④ The glass fiber method is to prepare a resin solution with epoxy resin and curing agent. After the resin solution is impregnated with glass fiber cloth, it is evenly wound on the leaking surface of the pipe or joint, and becomes glass fiber reinforced plastic after curing. Because this method is simple in construction, easy to master in technology, good in plugging effect and low in cost, it has a high Promotion and use value ;⑤ In recent years, we have also adopted quick repair joints to deal with pipe breakage and improve the speed of repair.
Shenzhen Jinchuanlai Environmental Protection Building Materials Co., Ltd. is an enterprise that wholesales and sells environmental protection plastic pipes: the company is the general agent of Formosa Plastics Nanya, Baodao Huanqi PVC pipes, pipe fittings, valves in Guangdong (there are many products such as national standard, American standard, Japanese standard, British standard water supply and chemical pipe fittings and valves); Have many years of experience in PVC-U, CPVC, PPH, PPR, PVDF, PP, PE and other plastic pipe fittings and valves; The Pearl River Delta has business outlets; With a sound marketing system and after-sales service system, and adhering to the business philosophy and product quality of South Asia Company, the Company will continue to pursue providing users with better products and services.
![](https://img3.bmlink.com/big/supply/2021/7/17/8/637621080522945443.jpg)
![](https://img3.bmlink.com/big/supply/2021/7/17/8/637621080658977682.jpg)
![](https://img3.bmlink.com/big/supply/2021/7/17/8/637621079659327926.jpg)
![](https://img3.bmlink.com/big/supply/2021/7/17/8/637621079997848520.jpg)
![](https://img3.bmlink.com/big/supply/2021/7/17/8/637621080270849000.jpg)