Main transformer explosion relief wall, Hefei detachable main transformer explosion relief wall, Hefei detachable main transformer pressure relief wall

Price

Electric discussion

  • Minimum order quantity: 18 square meters
  • Location: Hefei, Anhui
  • Price: electricity
  • Total supply: 1000 square meters
  • Delivery period: 15 days
  • Release time: 2024-06-14 15:37:02

Xu Juan: 18705514743 (Please tell me when you contact me“ Building materials network See the information, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

Main transformer explosion relief wall, Hefei detachable main transformer explosion relief wall, Hebei detachable main transformer pressure relief wall, Hefei main transformer pressure relief wall

Demountable main transformer explosion relief wall: (I) Construction method:

1. 9mm explosion relief plate (internal facing) UC150 Lightgage Steel Joist (Filled with rock wool) 9mm external explosion relief plate 9mm external decoration plate [double-layer staggered joint installation]

  2. keel Spacing can be 610mm

3. Waterproofing for exterior wall joints putty handle, wall external coating Whitewash

Attachment: Routine installation steps of explosion relief plate

I. Requirements for main materials and accessories

1. Main keels: keels along the top, ground, reinforced keels, vertical keels and horizontal keels shall meet the design requirements

2. Light keel accessories: support card, bracket, angle bracket, connecting accessories, fasteners, wall keel, batten and other accessories shall meet the design requirements

3. Fastening materials: nail, expansion bolt, galvanized tapping screw, wood screw and adhesive caulking material shall meet the design requirements

4. Filling sound insulation material: according to the design requirements (10 cm thick rock wool)

5. Cover plate: the specification and thickness of the pressure relief plate shall be selected by the designer or according to the drawing requirements

II. Important machines and tools

DC welding machine, electric toothless saw, electric hand drill, screwdriver, plumb bob, guiding rule, etc

III. Operation conditions

1. The basic acceptance work shall be completed before the construction of keel and explosion relief plate partition, and the installation of pressure relief plate shall be carried out after the plastering of roof, ceiling cabinet and wall is completed

2. According to the design engineering drawing and material plan, verify all materials of the partition wall to make it complete

IV. Operation Process

1. Process flow

Light partition wall setting out → installation of keel along the top and ground → vertical keel grading → installation of vertical keel → installation of horizontal keel clamp → one side pressure relief plate → insulation material filling → the other side pressure relief plate → construction gap practice → surface construction

2. Setting out

3. Install the door opening frame: after setting out, install the door opening frame of the partition wall according to the design

4. Installation of keels along the top and the ground: install the top keels and the ground keels according to the laid out location line of the partition wall, and fix them on the main body with nails at a distance of 600mm

5. Grading of vertical keel: according to the position of the door opening for setting out of the partition wall, after installing the top ground keel, according to the specification of 1220mm plate width of the pressure relief plate, the grading specification is 612mm, and the grading with insufficient modulus should avoid the position of the door opening frame side block cover panel, so that the broken side cover panel is not close to the hole frame

6. Installation of keel: install the vertical keel according to the grading position, insert the keel along the top and ground at the upper and lower ends of the vertical keel, and fix it with pop rivets after adjusting the verticality and positioning; The keel against the wall and the column side shall be fixed to the wall and column with nails or wood screws, and the nail spacing shall be 1000mm

7. Install the horizontal catch keel: according to the design requirements, when the partition height is greater than 3m, the horizontal catch keel shall be added and fixed with pop rivets or bolts

8. Install the cover panel

1) Check the installation quality of the keel. Whether the door opening frame conforms to the design and structural requirements, and whether the keel distance conforms to the modulus of the width of the relief plate

2) Install the pressure relief plate at one side, starting from the door of the house. The wall without door opening starts from one end of the wall. The pressure relief plate is generally fixed with self tapping screws. The distance between the screws at the edge of the plate is 200mm, and the distance between the screws and the edge of the pressure relief plate is 300mm. The distance between the screws and the edge of the pressure relief plate shall not be less than 10mm, nor more than 16mm. When the self tapping screws are fixed, the pressure relief plate must be close to the keel

3) Install electrical pipes, electrical boxes and electrical box equipment in the wall

4) Install fireproof, soundproof and moisture-proof filling materials in the wall, and install and fill them together with the pressure relief plate on the other side

5) Install the pressure relief plate on the other side of the wall: the installation method is the same as the pressure relief plate on the side, and the gap should be staggered with the side plate surface

6) Install the pressure relief plate: the fixing method of the second layer plate is the same as that of the layer, but the gap of the third layer plate is staggered with the layer, and cannot fall on the same keel with the gap of the layer

9. Seam practice: there are three types of gap practice of pressure relief plate, namely flat joint, concave joint and bead joint, which can be handled according to the following procedures

1) Apply caulking putty: before applying caulking putty, clean up the floating soil in the gap, embed the putty in the joint with a small scraper, and fill and scrape it with the board surface

2) Paste the tie tape: paste the tie material after the caulking putty is solidified. First, scrape a thin layer of thick adhesive putty on the gap, with the thickness of 1mm and the width of the tie tape. Then paste the tie tape, and use the middle scraper to scrape the pressing material from top to bottom to drive out the bubbles between the glue and the tie tape,

3) Scrape the middle layer of putty: immediately after pasting the tie strip, scrape another layer of middle layer putty which is about 80mm wider than the tie strip and about 1mm thick, so that the tie strip can be embedded in this layer of putty

4) Leveling putty: use a large scraper to fill the wedge groove with putty and level the plate

10. Wall decoration: pressure relief plate wall, according to design requirements, can be made with various finishes. Installation node diagram ↓

1. Technical preparation:

The construction project department is established. The engineering technicians of the project are familiar with the wallboard system drawings, understand the structural characteristics and engineering practices of the project, and communicate with the designers in time if there are problems.

2. Site preparation:

2.1 After mobilization, the installation personnel shall timely contact with Party A, the Owner and the Supervisor to understand the actual progress of the project, submit the data required by the Supervisor and the Owner, get familiar with the relevant documents and the project management procedures of the Supervisor and the Owner, and strictly implement the management procedures during construction.

2.2 Planning and layout of living quarters and material warehouses: according to the location of living quarters and material areas provided by Party A, make corresponding layout.

Workers' accommodation shed: 50 ㎡, kitchen: 20 ㎡, material warehouse: 15 ㎡

2.3 On site water and electricity: according to the connection point of the temporary water and electricity position on site provided by Party A, water and electricity will be led to the required position. Substation fabricated detachable explosion venting wall Substation fabricated detachable explosion venting wall Substation fabricated detachable explosion venting wall Substation fabricated detachable explosion venting wall Substation fabricated detachable explosion venting wall

  •  SECCO Fire Door Garage Automatic Door Industrial Door Co., Ltd

    SECCO Fire Door Garage Automatic Door Industrial Door Co., Ltd

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
/ Number of records: 98   home page previous page next page Last

Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

I want to join

 Personal WeChat
Online inquiry
  • Anhui SECCO Intelligent Technology Co., Ltd

  • Main transformer explosion relief wall, Hefei detachable main transformer explosion relief wall, Hefei detachable main transformer pressure relief wall