home page  >  Product supply  >  Decoration construction  >  Piping system  >  drainage system >Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team
  •  Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team

Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team

Price

Electric discussion

  • Minimum order quantity: 1
  • Location: Yancheng, Jiangsu
  • Price: electricity
  • Total supply: 77330
  • Delivery period: 1 day
  • Release time: 2024-09-20 00:01:28

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

Diver Frogman Service Company - Hengrui Underwater Engineering Co., Ltd

Underwater crushing is a quick, safe and cost-effective scheme for underwater demolition of plugging walls. The underwater removal of the sealing wall requires a professional diving construction team. Experienced divers - our divers have long-term underwater operation experience. Every year, many sealing walls are removed. Our divers have professional engineering diving certificates issued by Shanghai Salvage Bureau, so that everyone can work with certificates.
I. Preparation for underwater removal of plugging wall:
1. Site investigation is shown in the figure below:


2. Formulate scheme
2、 Prepare underwater Cutting equipment As shown in the figure:


(1) Light diving equipment E300.
(2) 0.35 cubic meters Air compressor One.
(3) Two sets of underwater interphone systems.
(4) A bottle of medical oxygen.
(5) Underwater Crushing equipment a set.
All personnel and equipment are provided by our company for labor and materials.
3、 Personnel
1. Two divers.
2. One diving assistant.
3. One person in charge of the site.
4. One safety officer.


2、 Preparatory work
1. The diving air compressor, diving equipment and underwater walkie talkie used on site shall be debugged and inspected before trial use, and the equipment used shall be subject to good performance.
3、 Cutting process and construction instructions
1. First, divers should conduct preliminary underwater exploration and visual inspection on the plugging wall piles to be removed to understand the site construction environment, especially how large the water level drop on both sides of the plugging wall is. The water level drop will form water pressure. Once the hole is broken, there will be suction. Divers should be careful to prevent being sucked.
2. The diving assistant prepares diving equipment and underwater crushing equipment, and the diver be launched When reaching the operation position, a small hole of about 10cm shall be broken to balance the water level on both sides of the plugging wall. At this time, divers can leave the water to rest and wait for the water level on both sides of the plugging wall to balance.
3. After the water level on both sides of the plugging wall is balanced, the divers begin to remove the entire plugging wall, and try to select the connection of two bricks to remove in a time-saving and labor-saving manner.
4. After dismantling, the diver will put the broken bricks into the woven bag and notify the personnel on the water to lift them out of the well bottom.
5. Arrange the on-site equipment and clean it.


4、 Safety measures
1. Three phase construction site Power Supply It must be normal and be in the charge of a specially assigned person;
2. The divers shall check and commission the oxygen supply equipment and underwater communication equipment before work;
3. When divers work underwater, the oxygen supply equipment must be guarded and managed by special personnel;
4. Connect another set of emergency oxygen supply equipment to the on-site oxygen supply equipment;
5. There must be more than two full-time divers on site;
6. On site diving equipment and communication equipment for emergency use must be debugged and placed on the construction site in advance;
7. The person in charge of the site must supervise the whole process of site construction.
Safety responsibility: if the project is our labor contract, we will prepare and implement construction safety measures. If there are any safety problems and responsibilities in the process of the project, we will bear them, which has nothing to do with Party A.

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    I want to join

    Online inquiry
    • Yancheng Hengrui Underwater Engineering Co., Ltd

    • Yuexi Sewage Pipeline Underwater Blocking Removal Construction Company Frogman Underwater Wall Removal Construction Team