Modification asphalt rubber Waterproof coating
Product Introduction
Modified asphalt rubber waterproof coating Based on waterproof polymer, it is equipped with a variety of auxiliary He Yan filler It is processed and applied to the waterproof base course when applicable. After curing, a flexible and continuous rubber waterproof film is formed on the surface of the base course. It is a new environment-friendly waterproof coating that is easy to operate and suitable for life field.
Product advantages
1. The coating film has high elasticity and strength, and has strong adaptability to the shrinkage and cracking of the base course;
2. The adhesive force of the coating film to the base surface is strong, and there is no need to apply additional interfacial agent on various base courses that meet the requirements;
3. The product can be used immediately after opening the cover. It is convenient to use and suitable for a wide range. It has obvious advantages for the construction of complex parts such as vertical and horizontal pipes;
4. The requirements for the moisture content of the base course are not strict, and the construction can be carried out on the wet base surface;
5. It has good weather resistance, air permeability, corrosion resistance, etc., and has no worries about product aging, swelling and mildew;
6. Aquatic products, harmless, tasteless, no volatile components of agricultural production system, green and environmentally friendly;
7. The color is adjustable, which can play the role of decoration and beautification, and can meet the customer's requirements for personalized color of the film;
Scope of application
Waterproof works for various civil buildings such as indoor and outdoor concrete structures, roofs, basements, external walls, balconies, kitchen and bathroom, underground garages, fountains, flower beds on the top floor, swimming pools and drinking pools;
Waterproof works for various industrial buildings such as factory buildings, water conservancy projects, grain warehouses, tunnels and bridges;
instructions:
Base surface treatment: the waterproof base shall be flat and firm, free of dust, oil stain, wax, etc., and the depression shall be leveled with mortar.
Construction method:
one . It can be used after opening the cover, and a small amount of water can be added when it is easy to paint (not more than the amount of five %) Make appropriate adjustment, pour the thermal coating onto the pretreated base surface, and apply it twice or more with a roller or brush to make the film thickness reach the required thickness. It is recommended that the second and the first coat be applied in a cross way, and the uncovered overnight maintenance can be carried out.
2. Joint treatment: when connecting cracks, it is recommended to add glass fiber mesh cloth (75mm more than the crack)
3. Reference principle: the coating thickness varies from 1.5-2.5/m2
quality guarantee period
1. At the storage temperature of 5 ℃ - 35 ℃, keep in storage On 12 months.
2. If there is a small amount of scaling or precipitation after uncapping, the performance will not be affected after the scaling is removed and the mixing is uniform;
3. The closed water test should be carried out after 7 days, and it is easy to bulge and fall off in a short time after soaking in the north water.