Water in water, water in water colorful coating , Marble Paint, imitation marble paint, marble paint, Hefei water in water, Hefei colorful paint, Hefei water in water colorful paint, Hefei Artistic coating Hefei Texture paint Hefei Metallic materials Paint, Hefei stone like paint, Hefei elastic paint
See the table below for counties and cities that can receive goods quickly;
Hefei Changfeng County Feidong County Feixi County Wuhu City Wuhu County Nanling County Fanchang County Bengbu City Huaiyuan County Guzhen County Wuhe County Huainan City Fengtai County Dangtu County Huaibei City Suixi County Tongling City Anqing City Tongcheng City Susong County Zongyang County Taihu County Huaining County Yuexi County Wangjiang County Qianshan County Huangshan City Xiuning County She County Qimen County Yi County Chuzhou City Tianchang City Mingguang City Jiao County Lai'an County Dingyuan County Fengyang County Fuyang City Jieshou City Linquan County Yingshang County Funan County Taihe County Suzhou City Xiao County Si County Dangshan County Lingbi County Chaohu City Hanshan County Wuwei County Lujiang County and County Lu'an City Shou County Huoshan County Huoqiu County Shucheng County Jinzhai County Bozhou City Lixin County Woyang County Mengcheng County Chizhou City Dongzhi County Shitai County Qingyang County Xuancheng City Ningguo City Maanshan City, Jixi County, Jingde County, Langxi County, Guangde County
Construction technology of natural granite coating and water in water multicolor coating
one Natural granite and marble plate wall structure:
The natural stone is heavy. To ensure safety, the method of double insurance is generally adopted, that is, the plate and the base are bound with copper wire, and then poured with cement mortar. The interval between the facing plate and the structural wall is 3~5cm, which is used as the grouting joint. When grouting, the grouting height is about 20cm each time, and the grouting will continue after setting.
2. Construction of natural granite and marble plate wall technology :
Base course treatment → base course reinforcement mesh installation → plate drilling → plate binding → grouting → caulking → polishing.
3. Structure and construction process of bluestone slab wall:
The structure and construction process of the bluestone slab wall can be pasted in a way similar to glazed tiles. The bluestone slab has high water absorption, so it should be soaked with water before pasting.
The pasting method of glazed tiles can be referred to for small specification stones and artificial stones used locally in family decoration.
Technological process of veneer wall decoration:
Basic process flow of veneer decoration
1. Paste glazed tiles:
Base course cleaning treatment → base plastering → brick selection → soaking → brick laying → line snapping → pasting standard Spot → paste tile → pointing → wiping → cleaning.
two Paste ceramic mosaic tiles:
Clean the base course → plaster the bottom mortar → arrange bricks and snap lines → paste → uncover paper → wipe joints.
three Key points of construction
During base course treatment, all kinds of dirt on the wall shall be cleaned and watered one day in advance. The protruding part of the concrete wall surface shall be chiseled, and the base course shall be chiseled to clean the floating ash. Or roughen with 107 glue cement mortar. After plastering the bottom mortar, when the bottom layer is 60% to 70% dry, arrange bricks and snap lines.
Before formal pasting, standard points must be pasted to control the flatness of the pasting surface. During operation, a guiding rule should be used to check the flatness at any time. If it is uneven or not straight, it should be removed for re pasting.
The tiles must be soaked in clean water for more than two hours before pasting, and the tiles shall be taken out to dry for use, subject to no bubbles.
When laying and pasting pipelines, lamp switches, supports of toilet equipment, etc., they must be cut and matched with whole bricks.
After inlaying, wipe the surface with cotton yarn, and then wipe the joints with white cement slurry.
four matters needing attention
The base course must be cleaned and free of floating soil and ash. The old wall surface shall be cleaned with original mortar.
Tiles must be soaked and dried in the shade. Because after the dry board is paved, the mortar moisture will be quickly absorbed by the board, causing dehydration of the cement mortar, affecting its setting and hardening, resulting in hollowing, shelling and other problems.