Rubber floor mats are block products, which can be divided into square and hexagon according to the shape. Square mats can be divided into 50cm square mats and cm square mats according to the specification. The thickness is generally between 1.5-2.5cm. "Thermoplastic rubber" is used, which can withstand 140 degrees of temperature and - 70 degrees of low temperature. It is not easy to deform and has no reactive odor. The common colors are green and dark line. Just shop together floor Similarly, users can directly lay on the flat hard ground one by one. Sports equipment can be put on it.
Pre paving steps: Floor Of
lay Rubber floor The indoor temperature and the ground temperature must be about 15 degrees. It is not recommended to be below 5 degrees or above 30 degrees. And the relative air humidity should be kept above 20% to 75%. In addition, the base course of the ground must be kept dry, and the moisture content should be less than 3%. After all these are completed, the flatness of the base course is required, and the surface must be kept clean.
Steps: processing of pads
Before paving, use the floor Mill Clean the floor, remove some stains and uneven places on the surface, and remove the empty surface.
The third step: treatment of self leveling
Priming (before priming, the water content must be tested, and the water content should be less than 3%). The primer is used to strengthen the close combination of self leveling and base course, playing the role of bonding and bridging. According to the instructions, roll coating on the base layer after thinly mixing the bottom layer. After the bottom layer is dried, the construction can start after leveling. Pour the mixed self leveling slurry onto the ground, control the thickness with self leveling, so that it will flow by itself and level the ground to meet the design requirements; If the design thickness is less than 4mm, it must be scraped with a specially used tooth scraper. After the construction, please close the site immediately, do not walk within 10 hours, and avoid heavy impact within 20 hours. The rubber floor can be laid after 1-2 days.
The fourth step: laying of rubber floor
After the rubber floor is transported to the site, it should be placed on the site for more than 24 hours, which is the memory restoration of the raw materials of the rubber floor, and its temperature is consistent with the temperature of the construction site. Before the construction of rubber floor, the self leveling shall be polished. The general requirement is to polish the self leveling surface in a large area to expose a solid surface, that is, Jieyang Environmental Rubber Floor Mat Indoor and Outdoor Rubber Floor Mat Mute and Environmental Protection