In response to the national call, Guangzhou Jiabaili Waterproof Engineering Co., Ltd FYT-1 improved deck Waterproof coating , Apm-100 second-order reactive deck waterproofing coating , Polymer modification asphalt Waterproof coating , SBS Modified asphalt waterproof coating R&D, manufacturing and production of bridge waterproofing pin New technology enterprise integrating sales and technical services. APM-100 reactive bridge deck waterproof coating (polymer modified asphalt waterproof coating) is a new type of composite waterproof coating produced by using domestic petroleum asphalt or imported petroleum asphalt as the main raw material, surfactant and various chemical additives as auxiliary raw materials, and then adding a large amount of polymer to modify it.
Gabriel Apm-100 second-order reactive deck waterproof material
|
Product characteristics
|
1. The construction process is simple. The construction can be done by mechanical spraying or manual painting, which is fast in drying and short in duration.
2. The waterproof layer is cheap, and generally only needs to be painted three times to achieve waterproof effect.
3. The waterproof layer is firmly bonded with the base course, and the waterproof layer is firmly bonded with the commercial port asphalt concrete.
4. The coating can resist high temperature up to 180 ℃ and low temperature up to - 35-50 ℃. It is improved on the basis of JT/T535-2004 and JC/T975-2005 standards.
|
Scope of application
|
It is applicable to waterproof works such as expressway bridges, urban overpasses, * * * bridges, bridges and culverts.
|
Amount of paint
|
1.5kg/m2, coating thickness is generally 0.5mm-0.7mm
|
matters needing attention
|
1. The construction temperature should be 0-35 ℃, and it is not suitable for construction in rainy days and freezing periods
2. Transportation: the product is harmless and nonflammable, and can be transported by general transportation methods
3. Storage: The storage period of the product is six months, and it should be stored in a warehouse above 0 ℃. In summer, it should be protected from sunlight
|
packing And logistics after-sales
|
1. Plastic drum packaging weight 50kg
2. Guangzhou Jiabaili Waterproof Engineering Co., Ltd. is located near Guangzhou Baiyun Logistics Park. It has a nationally developed logistics network system. It will arrive in three days in South China, East China, Central China and Southwest China, and it will arrive in four to five days in other regions.
3. The factory starts the batch with one barrel and prepays 30% of the deposit. When the goods are delivered to the local logistics network, they can be picked up after the balance payment is paid to the Gabriel factory.
|
1. Amount of paint
1.5kg/m2, coating thickness is generally 0.5mm-0.7mm.
2. Package weight
The packaging weight of this product is 50kg in plastic drums.
3. Precautions
① The construction temperature should be 0-35 ℃, and it is not suitable for construction in rainy days and freezing periods.
② Transportation: The product is harmless and nonflammable, and can be transported by general transportation methods.
③ Storage: The storage period of the product is six months, and it should be stored in the warehouse above 0 ℃. In summer, the sun should be avoided
Logistics timeliness
Guangzhou Jiabaili Waterproof Engineering Co., Ltd. is located near Guangzhou Baiyun Logistics Park. It has a nationally developed logistics network system. It will arrive in three days in South China, East China, Central China and Southwest China, and it will arrive in four to five days in other regions.
Cooperation mode
Factory starts with one barrel and prepays The deposit is for the goods to be delivered to the local logistics network, and the goods can be picked up when the balance is paid to the manufacturer of Gabriel.