home page  >  News Center  >  Event promotion >FYT-1 waterproof layer, bridge deck waterproof material, supplied by Anhui road and bridge waterproof coating manufacturer

FYT-1 waterproof layer, bridge deck waterproof material, supplied by Anhui road and bridge waterproof coating manufacturer

2021/9/13 16:07:22 Source: Guangzhou Jiabaili Waterproof Engineering Co., Ltd Views: ninety-two

FYT-1 waterproof layer, bridge deck waterproof material, supplied by Anhui road and bridge waterproof coating manufacturer

preface:

FYT-1 waterproof layer bridge deck waterproof material, Jiabaili waterproof manufacturer is located in Taihe Town, Baiyun District, Guangzhou, with fast delivery, good quality, qualified products, tested nationwide, and safe use.


Steel corrugated culvert pipe, also known as metal corrugated culvert pipe or corrugated culvert pipe, refers to the threaded corrugated pipe for culvert buried under the highway, * * *. It is a circular corrugated pipe made of corrugated metal sheets or semicircular corrugated steel sheets, which is widely used in highways, * * *, small bridges, passages, retaining walls and various mines and roadways

Characteristics of steel corrugated pipe culvert

① High strength, because of its unique corrugated structure, its compressive strength is more than 15 times greater than that of cement pipes with the same diameter.

② The transportation is convenient. The weight of corrugated pipe culvert is only 1/10 to 1/5 of that of cement pipe with the same diameter. Even if there is no transportation equipment in a narrow place, it can be transported manually.

③ Long service life. Steel corrugated pipe culvert is hot-dip galvanized with steel pipe, so it has a long service life of 80-100 years. When it is used in a highly corrosive environment, the steel corrugated pipe with internal and external surface asphalt coating can be increased by more than 20 years on the basis of the original service life.

④ Convenient construction: the corrugated pipe culvert is connected by sleeve or flange, and the length can be customized according to needs. Even unskilled workers can operate it. The construction can be completed in a short time with a small amount of manual operation, which is fast and convenient.

⑤ Excellent economy: the connection mode is simple, and the construction period can be shortened.

Culvert in retaining wall support and other works.

 

 Waterborne asphalt based bridge deck waterproof coating FYT-1 waterproof layer waterproof coating for the whole bridge

 

Wholesale price of FYT-1 and AMP-100 bridge deck waterproof coating suppliers

 

Product characteristics:

1. The construction process is simple. The construction can be done by mechanical spraying or manual painting. The drying is fast and the construction period is short.

2. The waterproof layer is cheap, and generally only needs to be painted three times to achieve waterproof effect.

3. The waterproof layer is firmly bonded with the base course, and the waterproof layer is firmly bonded with the upper asphalt concrete.

Product executive standard:

Water based Asphalt Waterproof Coating for Road and Bridge (JT/T535-2004) also conforms to the Standard of Waterproof Coating for Road and Bridge (JC/T975-2005).

 Waterborne asphalt based bridge deck waterproof coating FYT-1 waterproof layer waterproof coating for the whole bridge

Product construction method and process:

1) Preparation of construction tools:

The mixing bucket shall be prepared before construction, and the spraying machine or special bristle brush shall be prepared.

2) Base course requirements:

The strength of bridge deck and beam concrete shall reach the design mark, and the surface shall be free of loose laitance, peeling, hollowing and serious cracking. The surface flatness shall meet the requirements of bridge specifications. The elevation of the upper opening of the vertical drainage pipe shall be lower than the elevation of the base layer. The drainage outlet must be firmly installed with the base layer without any looseness.

3) Base treatment requirements: the base surface shall be clean and dry, free of accumulated water, dust, floating ash, impurities, oil stains, etc. Before the waterproof layer is made, the surface can be cleaned by air compressor, water purification, degreasing agent, etc. If there are hard sundries such as concrete and mortar, they should be polished off.

 Waterborne asphalt based bridge deck waterproof coating FYT-1 waterproof layer waterproof coating for the whole bridge

Construction steps of waterproof layer (take three coats as an example):

1) The barreled coating shall be stirred evenly before painting;

2) Before large-area painting, use a small brush to paint the leak twice, and apply waterproof paint on the internal corner for three times, and then paint once in a large area;

3) The second coating can be applied after the first coating is dry. The second coat of paint shall be applied after the surface is dry;

4) Coating amount: 1.5kg/m2, coating thickness is 0.50.77mm generally, and spraying is 1kg/m2;

5) The construction temperature should be 0-35 ℃. It is not suitable for construction in rainy days and freezing periods.

Product packaging: packed in iron drums with lids, each weighing 50kg, with product certificate affixed on the drums.

 Waterborne asphalt based bridge deck waterproof coating FYT-1 waterproof layer waterproof coating for the whole bridge

Disclaimer: Hangzhou Shangyi Information Technology Co., Ltd. does not declare or guarantee the correctness or reliability of all information published on CNBM Online; You hereby accept and acknowledge that you shall bear the risk arising from reliance on any information. Hangzhou Shangyi Information Technology Co., Ltd. has the right but not the obligation to improve or correct errors or omissions in any part of the information published.

News classification

Guangzhou Jiabaili Waterproof Engineering Co., Ltd

Building Materials General

eight year

Certified
  • Enterprise type:

    Building materials enterprises

  • Business model:

    Production and processing

  • Honors and qualifications:

    1 item

  • Main business:

    APM-100 second-order reactive waterproof coating for bridge deck, AWP-2000F fiber reinforced waterproof coating, FYT-1 improved waterproof coating for bridge deck, GBS environment-friendly waterproof material for bridge deck, HUT special waterproof coating for road and bridge, PB - Ⅰ polymer modified asphalt waterproof coating (PB - Ⅱ), SBS modified asphalt waterproof coating, high polymer modified asphalt waterproof coating

  • Address:

    No. 339, Pingzhong Avenue, Taiping Town, Conghua District, Guangzhou, Guangdong

I want to join

 Personal WeChat