The electric hoist has reasonable design, high structure, beautiful appearance, small size, light weight, high strength, high toughness, safe use, simple maintenance, and durability.
Compared with the electric hoist cable, the long-term working temperature of the cable should not exceed 80, and it has good wear resistance, cold resistance, UV resistance and oil resistance.
Can withstand moderate mechanical stress
![](https://img3.bmlink.com/big/supply/2018/7/7/0/891164095090313.jpg)
![](https://img3.bmlink.com/big/supply/2018/6/24/16/357794404662118.jpg)
![](https://img3.bmlink.com/big/supply/2018/6/24/16/556281117515769.jpg)
![](https://img3.bmlink.com/big/supply/2018/7/7/0/40786966933304.jpg)
Flame retardant flame retardant self extinguishing property conforming to IEC60332-1
Multi strand fine twisted flexible oxygen free copper wire overcomes the brittleness of the core wire. The modified PVC outer sheath is softer than ordinary rubber materials, and is tensile and tear resistant.
Suitable for severe weather conditions and outdoor installation. (Please specify your requirements when ordering)
Cable structure
The conductor multi strand oxygen free copper wire complies with GB/T3956-2008 standard.
Insulation soft insulation
Color identification Color core or black wire body White number, separate steel cable with 3 or more cores, with color/green two-color grounding wire
The inner liner is cushioned by wrapping the yarn with soft non-woven fabric.
Reinforced jute rope filler, self supporting steel wire, can transfer working tension without one or two twists.
Torsion resistant structural layer of core structure
Sheath material PVC/PUR material
Jacket color black (RAL9005)/gray (RAL7001)/orange (RAL2003)
![](https://img3.bmlink.com/big/supply/2018/6/24/16/184885440014715.jpg)
![](https://img3.bmlink.com/big/supply/2018/6/24/16/0645360499920957.jpg)
After receiving the electric hoist, you must immediately unpack the electric hoist and check the integrity of the document.
Ensure that the documents, instructions and certificates attached to the electric hoist are complete.
The equipment and spare parts must comply with the packing list and must not damage the appearance of the equipment. Before formal installation of electric hoist, the previous steps must be tested and identified before installation.
The buffer devices at both ends of the track or I-beam must be completely installed.
The I-beam support shall be constructed according to the drawings and firmly connected.
The I-beam shall be connected according to the drawing, the lower flange shall be polished smooth, and the wheel shall not be stuck.