Steel Geogrid This product is made of steel wire (or other fibers), specially treated ethylene (PE), and add others auxiliary It is a reinforced geotextile belt if it is extruded into a composite tension belt with rough embossing on the surface. This single strip is woven or clamped at a certain distance longitudinally and transversely, and formed by welding its junction points with the fusion welding technology of special reinforcement bonding. It is a reinforced steel plastic geogrid
What are the points of steel plastic grille:
1. With high strength, low creep and adaptability to various environmental soils, it can completely meet the use of large retaining walls in highways such as highways.
2. It can enhance the locking and occlusion of the reinforced bearing surface, greatly enhance the bearing capacity of the foundation, restrain the lateral displacement of the soil, and enhance the stability of the foundation.
3. Compared with the traditional grid, * * * has the advantages of high strength, strong bearing capacity, high friction coefficient, uniform holes, convenient construction and long service life.
4. * * * It is suitable for deep sea operation and bank reinforcement, which fundamentally solves the problem of other The gabions made of materials have low strength, poor performance, short service life and other technical problems due to long-term seawater erosion.
5. It can avoid construction damage caused by rolling and destruction of machines and tools during construction.
3、 How to construct steel plastic grille:
1. The paving surface of the geogrid shall be relatively flat. After the paving layer is accepted, in order to prevent longitudinal deflection, white lines or hanging lines shall be drawn on the paving layer according to the width, and then the paving can be started, and the end of the geogrid shall be fixed with U-nails (4 nails per meter of width, fixed at an even distance).
2. After fixing the end of the grid, use the paver or manual method to slowly pull the grid forward and straighten it manually every 10 meters until one roll of grid is paved, and then pave the next roll. The operation is the same as before.
3. Overlay: take the roll length as the length of the paved section. After the grid is paved within the length of the section, the overall paving quality shall be checked, and then the next section shall be paved. When the next section is paved, the grid and the grid shall overlap a grid net distance as the lap length, and continue to pave the section in the forward direction after being fixed with binding wire. By analogy, the operation requirements are the same as above.