The Anni effect is obvious, fruit is good and soft Waterproof coating
Ani effect is obvious, good, high, soft and waterproof coating , is a two-component, polymer emulsion modified cement Base waterproof material. It is composed of composite polymer emulsion, cement-based aggregate, selected polymer additives, etc. After on-site mixing and brushing, a tough elastic waterproof membrane is formed, which is firmly combined with the base course to prevent water penetration.
Scope of application |
Applicable to kitchen and bathroom balcony , bathroom, basement, swimming pool, external wall and roof waterproof works Applicable to all kinds of concrete, lightweight wall And masonry structure, such as kitchen, bathroom, basement, pool, etc It is applicable to waterproof of upstream and downstream It is suitable for sticking ceramic tiles with adhesive after waterproof treatment in kitchen and toilet. It is suitable for waterproof brushing of deformed base course such as gypsum board base course, fiber cement board base course and insulation board base course It is applicable to the waterproof brushing treatment of the surface of the old mosaic base course. |
? Cannot be used for oily base course
? It cannot be used for loose and non strength base course
Not suitable for outdoor use as directly exposed cover
Product advantages |
It can be directly constructed on wet or multi material base surface, but no ponding is allowed; It is easy to mix and construct, and is not limited by the geometry of the base course. Good waterproof and impermeable performance, good toughness, high elasticity, make up for minor cracks;; Environmentally friendly building materials, harmless, free from formaldehyde and other harmful substances High bond strength Simple and fast construction, one-time construction, double waterproofing; Better effect with the construction of Annette adhesive series products Construction, saving man hours |
Base course requirements:
The base course must be firm, dry, flat, stable, clean (free of dust, dirt, etc.) and have a certain bearing capacity
The base course must be free of hollowing, shell forming and obvious cracking in the development period.
Base treatment before construction
a) The dust and dirt on the surface must be removed to avoid affecting the bonding strength
b) In case of construction in high temperature season or when the wall is relatively dry, the base course shall be pre wetted with water before construction
Construction preparation
Construction steps:
1) Mixing:
First pour the emulsion of component A into a clean mixing bucket, then slowly pour the powder of component B into the mixing bucket according to the mixing ratio, and at the same time use a slow mixer to fully mix it until it is even and free of caking. The mixing time is about 3 minutes, and the mixing ratio of powder and liquid is: 2.6:1 The construction slurry can be used after it is left for 5 minutes and stirred for another 1 minute. Do not use this product with water or other materials;
2) Brush coating construction
For the absorbent base course (cement mortar, light wall, brick, etc.), a small amount of water shall be sprayed to wet the base course without water, and then the waterproof brushing construction shall be carried out to enhance the smoothness of brushing;
Two layers shall be painted with the cross method, and the thickness of each layer shall not be less than 0.5mm. The construction of each layer shall be carried out after the surface of the previous layer is dry (about 1-3 hours). The temperature and ventilation of the construction site will directly affect the drying time of the waterproof layer;
The internal corners must be fully brushed, and the junction between the base layer and the pipeline must be fully brushed to make an obvious R type. There shall be no defects such as missing brush and air holes. Generally, tile paving can be carried out after 1-2 days.
The mixed waterproof slurry shall be used up within 1 hour. When the slurry is used, it shall be intermittently mixed to avoid slurry sedimentation;
The closed water test shall be carried out after the waterproof coating is cured for 2~3 days. The water in the pool shall enter after it has been left empty for two weeks for a long time;
3) Cleaning
All tools and equipment shall be cleaned with water immediately after use.
Safety specifications
1) May cause damage to eyes
2) Contact with the exterior may lead to allergy and reaction to eyes, respiratory system and exterior
3) Keep out of the reach of children
4) Avoid inhaling dust
5) In case of eye contact, immediately flush with water and ask a doctor for help
6) Wear appropriate work clothes, gloves and eye and face protection when using
1.8~2.5 kg/m2
Product packaging information |
? Net weight:
18kg/barrel (general type)
? Color: component A (emulsion) - white
Component B (powder) - grey
? Consumption: 1.8~2.5 kg/m2
? Shelf life: 1 year/from production date
? Storage: put it on a wooden tray in a dry place
? Executive standard: JC/T984-2011 GB23445-2009
? Suitable storage temperature: above 5 ° C