home page  >  Product supply  >  Ceiling partition  >  Partition wall  >  Movable partition >Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer
  •  Taizhou Shuermei high-quality hotel partition manufacturer

Taizhou Shuermei high-quality hotel partition manufacturer

Price

MOQ

740.00 yuan/square meter

30 to 100 square meters

720.00 yuan/square meter

More than 100 square meters

  • Minimum order quantity: 10 square meters
  • Location: Yancheng, Jiangsu
  • Price: electricity
  • Total supply: 90000 square meters
  • Delivery period: 3 days
  • Release time: 2016-04-09 09:03:27

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Place of Origin:

    ynz

  • Brand:

    Souermei

  • Type:

    T-type

  • characteristic:

    convenient

  • model:

    Type 65

  • Specifications:

    sixty-five

  • Scope of application:

    hotel

Jiangsu Shuermei Hotel Movable partition , the office shutter partition is ranked better by Baidu, and the quality service is better. Manager Liu's hotline***

Characteristics of movable partition system

1. The partition product is a modern and advanced architectural decoration style, which can quickly separate the space and is convenient to use, and has sound insulation, heat insulation and fire prevention functions.
2. The wallboard is made of * * * degree steel skeleton, special rubber, high-quality sound insulation cotton and Veneer The board surface is flat, firm and collision resistant.
3. Wall panel is embedded in aluminium alloy The straight and universal steel wheel hoisting in the track, combined with the flexible track direction, is suitable for a variety of different stacking and storage requirements.
4. No track is laid on the ground, just hang the track on the ceiling and keep it level with the decorative ceiling; It does not affect the overall coherence of the space and changes invisibly.
5. Upper and lower wall panels and horizontal rubber sound insulation paper strip seal The free stretching of the wall panel can enhance the sound insulation performance of the wall panel.
6. The telescopic performance operation mode fully reflects the people-oriented concept, and the touch is flexible Spring More safe and durable operation.
7. Single door and double door can be installed on the wallboard as required to facilitate access.
8. The wall panel surface can be matched with a variety of finishes to achieve different decorative effects.

Model of Shuermei movable partition system

Type 65

I, Souermei Type 65 series partition can be divided into 360 degree turn omnidirectional single panel type or unidirectional double panel type.

2、 The top adopts 65 or 80 type track and hanging wheel, which can flexibly divide the space in all directions and at multiple angles.

3、 The screen frame enterprise material and other materials are processed and made of 6063T6 grade aluminum alloy, which is the * * * grade material in the industry.

4、 Applicable to * * * degree of 2m -- 4.5m, and the larger bearing capacity of track is 250kg/m.

5、 Widely used in hotels, guesthouses, exhibitions, multi-function conference halls.

80 type

I, Souermei Type 80 series partition can be divided into 360 degree turn omnidirectional single panel type or unidirectional double panel type.

2、 The top adopts 80 type track and hanging wheel, which can divide the space flexibly in all directions and at multiple angles.

3、 The screen frame enterprise material and other materials are processed and made of 6063T6 grade aluminum alloy, which is the * * * grade material in the industry.

4、 Applicable to * * * degree of 3m -- 7.5m, and the larger bearing capacity of track is 450kg/m.

5、 Widely used in hotels, guesthouses, exhibitions, multi-function conference halls.

Type 100

I, Souermei The 100 series partition can be divided into two types: 360 degree turn omnidirectional single panel type or unidirectional double panel type.

2、 The top adopts 100 type track and hanging wheel, which can divide the space flexibly in all directions and at multiple angles.

3、 The screen frame enterprise material and other materials are processed and made of 6063T6 grade aluminum alloy, which is the * * * grade material in the industry.

4、 It is applicable to the * * * degree of 5m -- 9m, and the larger bearing capacity of the track is 650kg/m.

5、 Widely used in hotels, guesthouses, exhibitions, multi-function conference halls.

Very * * * type

2、 The top adopts special * * * type track and hanging wheel, which can flexibly divide the space in all directions and at multiple angles.

3、 The screen frame enterprise material and other materials are processed and made of 6063T6 grade aluminum alloy, which is the * * * grade material in the industry.

4、 It is applicable to a * * * degree of 8m -- 16.5m, and the larger bearing capacity of the track is 1250kg/m.

5、 Widely used in hotels, guesthouses, exhibitions, multi-function conference halls.

Installation method and precautions of movable partition

1. Observe the construction environment
Up to now, the survey of the construction environment is the primary necessity. The main purpose of the survey of the construction environment is to determine whether the site has installation conditions, record the position of the beam and column on the roof, the position of the air conditioning pipeline system, etc. to customize the final construction scheme. The suitable time for construction is before the site is decorated.

2 Measurement and positioning
According to the construction drawing, set out the position control line of the movable partition on the indoor ground, and lead the position line of the partition wall to the side wall and roof. The installation position line of the fastener shall be snapped when snapping the line. The track installation must be discussed with the construction team for ceiling installation, otherwise it will cause great trouble.

3 Installation of steel structure and rail fastener
The steel structure is a load-bearing structure connecting the roof and the track. The steel structure involves the safety of the entire movable partition system, so it must not be taken lightly. According to the construction drawing, screw the tension bolt on the roof, and then weld and fix the angle iron. Select rail fasteners according to design requirements. Before installing the track, the closing method of the wall, ground and ceiling shall be considered to facilitate the installation of the movable partition. The load borne by the track and the specification and fixing method of the embedded parts shall be determined by calculating the weight of the movable partition. The embedded parts of the track shall be installed firmly, the track and the main structure shall be fixed firmly, and all metal parts shall be subject to anti rust treatment.

4 Installation track
(1) Suspended track: the suspension guide is fixed by installing a pulley on the top surface of the partition and connecting it with the upper suspended track. Track and pulley shall be selected according to the size of bearing capacity. For light movable partition wall, the track is fixed on the top wood frame or steel frame with wood screws or screw screws. Heavy movable partition wall, the track is fixed on the profile steel skeleton with screws or welding.
(2) Supporting track: the supporting guide is fixed by the pulley at the lower part of the diaphragm, which forms the lower supporting point with the ground track. The track shall be fixed with expansion bolts or embedded parts of the track, and guide rails shall be installed on the top timber frame.
(3) When installing the track, the pulley or reserved opening of the track shall be installed in advance according to the specific situation of the track (generally 1/2 partition near the wall)

5 Installing the movable panel
According to the installation method, accurately mark the pulley setting line on each panel, and then fix the pulley fixing frame on the upper or lower stiles of the partition with screws. Then put the panels into the track one by one, adjust each panel to be vertical to the ground, and push, pull and rotate flexibly. Later, connect and fix each panel. Generally, adjacent panels are connected by hinges.

6 Finishes
Finish according to design requirements. Generally, soft bags, cold mounted solid wood boards, veneered panels, glass inlays, etc. are used. Paint finishing or edge trimming shall be carried out after finishing. Finish decoration construction shall be carried out according to the corresponding secondary standard requirements.

7. Commissioning
After the movable panel is installed, details such as panel * * * low and sealing shall be carried out.

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Supply Classification

    Yancheng Shuermei Decoration Materials Co., Ltd

    Building Materials General

    twelve year

    Certified
    • Enterprise type:

      Building materials enterprises

    • Business model:

      Production and processing

    • Honors and qualifications:

      0 items

    • Main business:

      Office partition, hotel partition, finished glass partition mobile partition

    • Address:

      Group 8, Taoyuan Village, Chenyang Town, Sheyang County, Yancheng, Jiangsu

    I want to join

    Online inquiry
    • Yancheng Shuermei Decoration Materials Co., Ltd

    • Taizhou Shuermei high-quality hotel partition manufacturer