Construction contract disputes can be resolved through a variety of ways: reconciliation depends on voluntary communication between both parties to seek a harmonious consensus; Mediation promotes compromise based on facts and logic through the assistance of a third party; Arbitration means that both parties agree to submit the dispute to a third party for arbitration; Litigation means that the aggrieved party requests the court to try according to law, protect rights and interests, and realize fair adjudication.
#Construction project disputes
867 readings
-
We have the right to postpone the construction period for the following reasons: the owner fails to provide complete design drawings and necessary commencement conditions on schedule; The Owner's payment is delayed or insufficient, affecting the operation; The Employer's Representative failed to provide the specified instructions and approval documents as scheduled. Any of the above circumstances will prompt us to adjust the construction plan according to the contract.
#Construction project disputes
1296 readings
-
When the project settlement exceeds the contract price, it will be analyzed according to the actual construction. First, settlement shall be made according to the pricing rules specified in the contract; Secondly, the design changes lead to changes in the quantities of works, with reference to the standards published by the local construction department; Finally, if the Nu Skin Agreement conflicts with the bid winning contract, the record of the bid winning contract shall prevail to ensure fair settlement.
#Construction project disputes
930 readings
-
After the termination of the construction contract, even if the project has been completed, the Contractor has the right to require the Employer to conduct acceptance according to the construction drawings, acceptance specifications and standards. According to the law, the construction project can be completed only when the following conditions are met: the design of production facilities is completed, the trial operation of process equipment is qualified, the production demand is met, the facilities are constructed and operated on schedule, the production is ready, and the environmental protection, safety, and fire protection facilities are completed and put into use simultaneously with the main project. The construction and acceptance of industrial projects shall comply with relevant national and industrial regulations.
#Construction project disputes
1467 readings