When the project settlement exceeds the contract price, it will be analyzed according to the actual construction. First, settlement shall be made according to the pricing rules specified in the contract; Secondly, the design changes lead to changes in the quantities of works, with reference to the standards published by the local construction department; Finally, if the Nu Skin Agreement conflicts with the bid winning contract, the record of the bid winning contract shall prevail to ensure fair settlement.
#Construction project disputes
930 readings
-
After the termination of the construction contract, even if the project has been completed, the Contractor has the right to require the Employer to conduct acceptance according to the construction drawings, acceptance specifications and standards. According to the law, the construction project can be completed only when the following conditions are met: the design of production facilities is completed, the trial operation of process equipment is qualified, the production demand is met, the facilities are constructed and operated on schedule, the production is ready, and the environmental protection, safety, and fire protection facilities are completed and put into use simultaneously with the main project. The construction and acceptance of industrial projects shall comply with relevant national and industrial regulations.
#Construction project disputes
1467 readings
-
Even if the project affiliation contract is invalid, if the project has passed the completion acceptance, the owner shall pay as agreed. However, if the repair is still unqualified, the contractor cannot claim the discount settlement. Even if the contract is invalid, compensation can be negotiated as long as the project is qualified. If the project is unqualified, the owner can require the contractor to bear the repair cost; The Owner shall be responsible for any loss caused by quality problems. The delay of the construction period may be caused by the delay of material distribution, which may lead to delay or compensation. When the construction period is delayed due to material supply problems, the construction period is usually allowed to be extended.
#Construction project disputes
1362 readings
-
The laws and regulations of the construction industry clearly stipulate that only enterprise entities with corporate capacity and corresponding construction industry qualifications have the right to sign large and complex construction documents. An individual has no such qualification. Signing a construction project contract agreement with others in the name of an individual is deemed invalid in law, because it is beyond the scope of business and qualification requirements of an individual.
#Construction project disputes
1436 readings