When the project settlement exceeds the contract price, it will be analyzed according to the actual construction. First, settlement shall be made according to the pricing rules specified in the contract; Secondly, the design changes lead to changes in the quantities of works, with reference to the standards published by the local construction department; Finally, if the Nu Skin Agreement conflicts with the bid winning contract, the record of the bid winning contract shall prevail to ensure fair settlement.
#Construction project disputes
930 readings
-
After receiving the notification of award, the bid winner shall sign a written contract with the bid affairs client within the legal period (30 days), and shall not violate the terms of the bidding documents and bidding documents. It is very important to sign the contract after winning the bid. Overdue time may lead to contract invalidation and disputes. The winning bidder shall perform the project according to the contract, and it is forbidden to transfer the winning project without authorization, otherwise it will constitute a breach of contract, which may affect the project quality and the original intention of bidding. The transfer of the winning project is regarded as a violation of the contract subject, with great risk.
#Construction project disputes
967 readings
-
The warranty period of construction projects in China follows the legal standards: the reasonable period of foundation and main structure works is specified in the design documents; Five years for roof waterproofing, toilet equipment waterproofing and external wall leakage prevention; The maintenance cycle of heating and cooling system is two heating or cooling periods; The electrical circuit and other projects are guaranteed for two years. The duration of other projects shall be determined by the Employer and the Contractor through consultation. The warranty period starts from the date of completion acceptance.
#Construction project disputes
1328 readings
-
After the termination of the construction contract, even if the project has been completed, the Contractor has the right to require the Employer to conduct acceptance according to the construction drawings, acceptance specifications and standards. According to the law, the construction project can be completed only when the following conditions are met: the design of production facilities is completed, the trial operation of process equipment is qualified, the production demand is met, the facilities are constructed and operated on schedule, the production is ready, and the environmental protection, safety, and fire protection facilities are completed and put into use simultaneously with the main project. The construction and acceptance of industrial projects shall comply with relevant national and industrial regulations.
#Construction project disputes
1467 readings