stay furniture Before entering the site, it is necessary to purchase the furniture and determine Furniture The location and size of the furniture will not be in a hurry when entering the site. Finished furniture Pay attention to the floor and metope Protect and take precautions to avoid friction and damage to the floor and wall. renovation What is the order of furniture entry? What furniture should be used first? What protection should be done for furniture access floor and floor?
![](//static-news.17house.com/web/news/201809/30/201809301058274102.jpg!w630)
Mobilization sequence of decoration furniture:
1、 cupboard Mobilization
The cabinet is the whole Home Furnishing renovation The first furniture to enter the market in China, while the entry of cabinets is also complicated, and the house needs to be Cabinet Designer For the original measurement, it is also necessary to confirm with the water and electricity workers whether the position of the cabinet is in conflict with other lines and other pipes. After the water and electricity construction in the kitchen is completed and the tiles are pasted, the cabinet designer needs to make a second measurement to determine the style and specific size of the cabinet. During the installation of the cabinet, the water electrician needs to test whether the water and electricity are normal. If Cabinet installation Too late, it's hard to decoration company Coordination, easy to delay the construction period.
![](//static-news.17house.com/web/news/201809/30/201809301058281869.jpg!w630)
2、 toilet utensils Mobilization
The sanitary ware is the second in the order of furniture entering the site, and it also needs to wait until the sanitary ware enters the site TOILET Only after the completion of the hydropower project and the cement works in China can it be completed. When purchasing sanitary wares, bathtubs and other products, it is best to measure the size first, and pay attention to whether the position between the toilet and the sewage outlet is appropriate. Before installation, it is necessary to give the installation drawings to the bricklayers to reserve their positions. If there are other requirements, they should notify their workers in advance to avoid the problem of water connection failure.
![](//static-news.17house.com/web/news/201809/30/201809301058293156.jpg!w630)
3、 Wooden doors Mobilization
The third item in the order of furniture entering the site is the wooden door. Before starting work, the wooden door manufacturer needs to measure the size. If Door opening size If there is a problem, it is necessary to negotiate with the home decoration workers and make appropriate suggestions for modification, and clearly inform the workers whether to use ceramic tiles or floors for decoration, because this will involve Wooden door installation Yes, there is a problem of leaving a gap to avoid too large a gap in the wooden door, which will affect the overall aesthetics.
![](//static-news.17house.com/web/news/201809/30/201809301058305565.jpg!w630)
4. Floor mobilization
The entry of floor is the fourth in the order of furniture entry, and also the last in the household decoration. Before the oiler starts construction, it is necessary to determine whether the tile or floor is paved.
If the kitchen and bathroom are paved with ceramic tiles, while the bedroom and living room are paved with wood floors, workers need to be informed to get ready. In the process of laying the floor, in order to allow workers to successfully complete the construction, accessories such as door stones, solid wood bars or copper bars should be purchased in advance.
![](//static-news.17house.com/web/news/201809/30/201809301058312788.jpg!w630)
Protection of furniture entering the site:
Before mobilization:
1. Use wear-resistant floor. The wear-resistant floor is made by pressing the U-groove hot pressed steel template in the production process of the floor. It uses the optical principle to design a solid wood visual line, create a log visual effect, and enhance the wear-resistance of the floor.
2. Using combination furniture 。 In the current home decoration design In addition to some household appliances, Shenyang Decoration Company feels that there are fewer and fewer products that need to be purchased separately. It can purchase combination furniture and directly splice and combine them in the room after decoration, which will not cause floor friction problems and will also be more convenient.
![](//static-news.17house.com/web/news/201809/30/201809301058313675.jpg!w630)
When entering the site:
1. When furniture enters the site, first lay a blanket or cardboard shell on the floor, which can effectively reduce the friction between furniture and the floor, so as to protect the floor.
2. When workers move furniture, they need to wrap a layer of protective film on the edges and corners of the furniture first, which can not only avoid scratching the floor, but also prevent some bumps and injuries to the furniture when they move the furniture.
Here is the introduction of the furniture entry sequence. Other furniture in the home is completed in the later stage of decoration, and can be selected according to the home style. When the finished furniture enters the site, it is necessary to protect the floor and wall, do a good job in prevention, and avoid friction and damage to the floor and wall.
![](//static-news.17house.com/web/news/201809/30/201809301058343368.jpg!w630)
Decoration network together 70% of the users of the listed decoration platform come from public praise
We promise: Decoration process 0 Additions
Full refund at any time after signing the bill and before commencement
We are not satisfied with the construction quality. We will bear the cost of smashing and reinstalling
![](//s1.17house.com/home/images/line_bottom.png)