Hello, welcome to the official website of Xinshenghao!

National service telephone

400-631-1914

Xinshenghao Product Center

Professional design, processing, production and installation of various membrane structure products

Contact Xinshenghao

CONTACT US

Hotline:

400-631-1914

Tel.: 021-51692305
Fax: 021-57745350
Mobile: 13391126359
QQ:314104987
Email: 314104987@qq.com
Address: 245, Building 2, No. 655, Gaoji Road, Songjiang District, Shanghai (Headquarters)
Factory address: No. 11, Zhonggang Road, Xinzhuang Town, Changshu, Suzhou

Follow up reverse hanging membrane capping and sealing

Product introduction:
Follow up reverse hanging membrane capping and sealing
Membrane material: PVC PVDF fluorocarbon fiber membrane;
Steel structure: Q235, seamless welded pipe, high-frequency welded pipe H-shaped steel, etc;
Service life: more than 15 years;
Structural style: tensile membrane structure, skeleton membrane structure;
Contracting method: design, processing, production, construction and installation of follow-up reverse hanging membrane capping and sealing;
Price: calculated according to the actual amount of follow-up reverse hanging membrane capping and sealing.

Ordering hotline: 400-631-1914

Product Details/ PRODUCT DETAILS

 Follow up reverse hanging membrane capping and sealing



choice Follow up reverse hanging membrane capping and sealing The following conditions shall be met for the sewage tank of


1. The pool body meets the peripheral transmission requirements. Only when the sludge treatment equipment in the sewage pool is driven around can the follow-up reverse hanging membrane be used for sealing, and the sealing cover can rotate with the power system of the mud scraper.


2. The periphery of the sewage pool shall have a certain bearing capacity. Generally, the cover sealing of the follow-up reverse hanging membrane depends on the pulley and rotates with the mud scraper. However, since the cover seal of the follow-up reverse hanging membrane is a steel supporting membrane structure with a large weight, it is easy to collapse if the bearing capacity around the sewage pool is small. Therefore, a circle of foundation shall be made as the bearing ground before the sealing installation of the follow-up reverse hanging membrane. If there is a bearing foundation, it can be ignored.

From: follow-up reverse hanging membrane capping and sealing

Please fill in purchase The product quantity and product description of are convenient for us to prepare goods uniformly.

Submit

Shanghai Shenghao Industrial Co., Ltd

Tel: 400-631-1914, 021-51692305 Fax: 021-57745350 QQ: 314104987

Mail: 314104987@qq.com Address: 245, Building 2, No. 655, Gaoji Road, Songjiang District, Shanghai (Headquarters)

Factory address: No. 11, Zhonggang Road, Xinzhuang Town, Changshu, Suzhou

Copyright © 2018 Shanghai Shenghao Industrial Co., Ltd    HUICPB No. 18041563 HGWNAB No. 31011702007956

Scan WeChat


Consulting hotline

400-631-1914

Online Service