one 、 epoxy Prime coat
(1) Before construction, ensure that the ground is clean, and remove any debris adhesion.
(2) , will epoxy resin and curing agent Mix and mix in the correct proportion.
(3) After mixing evenly, use scraper or roller Application method.
(4) It is required to strengthen the attachment force by soaking.
(5) The epoxy intermediate coating shall be applied after the previous drying.
Test method: ensure epoxy Primer The small holes on the surface are closed in an integrated way, and a sealing film is formed on the surface layer.
two Epoxy intermediate coating mortar layer
(1) Before construction, ensure that the ground is clean, and remove sundries if any;
(2) . Mix the epoxy resin and curing agent in the correct proportion, and add a certain amount of quartz sand in the proportion, and pour them on the ground. Use a trowel to evenly trowel the materials according to the design thickness to increase strength and impact resistance; Make the ground more solid and pressure resistant.
(3) After the midcoat is dry and solidified, polish the surface of the floating objects and particles.
(4) Clean the dust.
Inspection method: whether the construction handover treatment is proper, the skirting line position is straight, without separation from the wall, and flat.
three Epoxy surface coating
(1) Keep clean before construction, and remove sundries if any;
(2) Mix component B of surface coating material evenly first; Then add the curing agent to mix and fully stir;
(3) Use a 3mm trowel to trowel the surface.
(4) Pay attention to the handling of the handover points of the successive construction; The coating shall be uniform without sagging.
Test method: the ground is even in color, free of sagging, pinholes, smooth and flat.