Chapter 330 Start of Diving (Two in One)

"The first pressure test of the Trieste! The pipeline pressure is 300 atmospheric pressure, and the valve is opened!"

"The first circuit test! Full switch full load preparation, on!"

"Propulsion system test run, 80% output!"

"The memory metal film is ready for power on!"

In the dock, the Rock Flow Research Institute is making the final detection of the ship. Technicians shout, thousands of cables are connected to the ship, and dozens of instruments are flashing around it. This dock is adjacent to the power room of Xumizhou, and the concrete insulation wall cannot block the heat of those boilers in the power room ...

Go to QQ and read the APP to see the following highlights