Spent fuel receiving and storage building:Cools down and temporarily stores fuel assemblies that have been brought to the reprocessing plant until their radioactivity has decreased sufficiently。
横向制动
Cuts cooled fuel assemblies into small pieces with a shearing machine and dissolves themina dissolver containing nitric acid.Undissolved residue(metal chips such as cladding tubes)is removed from this nitric acid solution containing dissolved fuel meats using a clarifier。
分批装料
Separates the dissolver solution generated in the previous process into uranium stream,plutonium stream,and fission products’stream。
Purification building
Removes the small amount of residual fission products from the uranium and plutonium solutions for purification。
阻尼building
Removes nitric acid from the purified uranium solution and the mixed uranium/plutonium solution to produce uranium oxide powder and uranium/plutonium mixed oxide powder。
Our products are delivered mainly for the spent fuel receiving and storage building,the separation building,the purification building,the low active liquid waste treatment building,and the control building。